Skip to content
PlanIndex Get alerts
Menu

Planning application

Paddington Station Praed Street London W2 1HB

Awaiting decision Westminster 26/05683/LBC Heritage and listed buildings

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of a telecommunications cable within a Grade I listed building to provide fibre connectivity at Unit 8.

As published by the council, reference 26/05683/LBC

Application record

Reference
26/05683/LBC
Category
Heritage and listed buildings
Status
Pending
Received
19 Aug 2026
Validated
19 Aug 2026
Postcode
W2 1HB

Site history

Applications at this address on the Westminster register

This site has had 7 applications since 2025: 2 approved, 0 refused.

  • 26/04001/LBC Decided

    Paddington Station Praed Street London W2 1HB

    Installation of a telecommunications cable within a Grade I listed building to provide fibre connectivity (Unit 33 Station Concourse).

    Submitted 17 Jun 2026 Heritage and listed buildings
  • 26/03947/ADLBC Decided

    Paddington Station Praed Street London W2 1HB

    Detailed drawings of fixing method drawing and specification fixing method A and B. and Conservation Method Statement pursuant to part conditions 4e of listed building consent dated 2nd May 2024 (RN 23/01572/LBC)

    Submitted 16 Jun 2026
  • 25/07701/LBC Awaiting decision

    Paddington Station Praed Street London W2 1HB

    Installation of 1 internally illuminated fascia sign measuring 2.473m x 0.255m

    Submitted 24 Oct 2025 Heritage and listed buildings
  • 25/07185/LBC Granted

    Paddington Station Praed Street London W2 1HB

    Replacement of 4 freestanding digital totems within the concourse area of Paddington Station

    Decided 18 Nov 2025 Heritage and listed buildings
  • 25/06091/CLLB Withdrawn

    Paddington Station Praed Street London W2 1HB

    Replacement of 4 freestanding digital totems within the concourse area of Paddington Station.

    Decided 1 Oct 2025
  • 25/04495/ADLBC Granted

    Paddington Station Praed Street London W2 1HB

    Detailed written and photographic record of the trial panel(s) and final proposed materials specification based on what is agreed for that trial panel; pursuant to condition 6 of Listed Building Consent dated 27th June 2022 (RN: 20/06448/LBC)

    Decided 8 Oct 2025 Conditions

Timeline

Dates from the published record

  1. 19 Aug 2026

    Received by Westminster

  2. 24 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 87 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Paddington Station Praed Street London W2 1HB

    26/04001/LBC Submitted 17 Jun 2026 0m away

    90% historically approved · decision due ~12 Aug

    Installation of a telecommunications cable within a Grade I listed building to provide fibre connectivity (Unit 33 Station Concourse).

    Decided Heritage and listed buildings
  • Paddington Station Praed Street London W2 1HB

    25/04495/ADLBC Submitted 1 Jul 2025 0m away

    Detailed written and photographic record of the trial panel(s) and final proposed materials specification based on what is agreed for that trial panel; pursuant to condition 6 of Listed Building Consent dated 27th June 2022 (RN: 20/06448/LBC)

    Granted Conditions 15 docs
  • Paddington Station Praed Street London W2 1HB

    26/03947/ADLBC Submitted 16 Jun 2026 0m away

    89% historically approved · decision due ~11 Aug

    Detailed drawings of fixing method drawing and specification fixing method A and B. and Conservation Method Statement pursuant to part conditions 4e of listed building consent dated 2nd May 2024 (RN 23/01572/LBC)

    Decided
  • Ground Floor Paddington Station Praed Street London W2 1HB

    26/04179/ADLBC Submitted 24 Jun 2026 0m away

    89% historically approved · decision due ~19 Aug

    Details of Sign 28, 104 and 105 pursuant condition 4 (parts b and c only) of Listed Building Consent dated 2nd May 2024 (RN 23/01572/LBC)

    Decided
  • Tournament House Paddington Station Praed Street London W2 1HB

    26/01469/LBC Submitted 6 Mar 2026 0m away

    90% historically approved · decision due ~1 May

    External masonry repairs to the front facade and temporary erection of scaffolding.

    Awaiting decision Heritage and listed buildings 7 docs
  • Ground Floor Unit 1 Paddington Station Praed Street London W2 1AE

    26/03227/LBC Submitted 15 May 2026 35m away

    90% historically approved · decision due ~10 Jul

    Installation of one illuminated signage, amended location at Starbucks, Paddington Station, Mezzanine, Heathrow Express Area.

    Awaiting decision Heritage and listed buildings 11 docs

In Westminster

  • 26/06025/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06024/FULL)

    3 Sep 2026 Heritage and listed buildings
  • 26/05971/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Automation of door at principal floor level.

    1 Sep 2026 Heritage and listed buildings
  • 26/05962/LBC Awaiting decision

    Royal Albert Hall Kensington Gore London SW7 2AP

    Variation of condition 2 of listed building consent dated 26 March 2024 (RN: 24/00820/LBC) for the: Erect temporary access scaffolding platform at high level in the auditorium to inspect the condition of the plaster ceilings and main cornices. NAMELY, to allow the gantry to remain in place until December 2028.

    1 Sep 2026 Heritage and listed buildings
  • 26/05970/LBC Awaiting decision

    Norman Shaw Building South Victoria Embankment London SW1A 2HZ

    Replacement and installation of 16 electronic access control systems to Norman Shaw South

    1 Sep 2026 Heritage and listed buildings
  • 26/05943/LBC Awaiting decision

    1 Barton Street London SW1P 3NG

    Use of the building as F1(a) Education, along with associated internal and external alterations. (Linked with 26/05942/FULL)

    1 Sep 2026 Heritage and listed buildings