Skip to content
PlanIndex Get alerts
Menu

Planning application

Development Site At Chelsea Barracks Chelsea Bridge Road London

Decided Westminster 26/05631/TPO Trees

Works: Trees

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Tree surgery as per attached specification entitled 26/05631/TPO Chelsea Barracks, Chelsea Bridge Road, London dated 03 September 2026.

As published by the council, reference 26/05631/TPO

Application record

Reference
26/05631/TPO
Category
Trees
Status
Decided
Received
18 Aug 2026
Validated
18 Aug 2026
Decided
3 Sep 2026

Site history

Applications at this address on the Westminster register

This site has had 10 applications since 2017: 3 approved, 0 refused.

  • 26/06552/NMA Awaiting decision

    Development Site At Chelsea Barracks Chelsea Bridge Road London

    Amendments to planning permission dated 16 November 2018 (RN:18/04103/OUT) for Variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN: 17/07176/OUT) which itself varied conditions 1, 26, 53, 54 and 55 of planning permission dated 27 September 2016 (RN: 16/04998/OUT) for the demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (a maximum of 448 units), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings. Namely, amendments including adjustment of parameter lines to P21 to form 2 plots, P21a and P21b; addition of 1.3m wide Zone of Horizontal Deviation for Articulation on P21b and P22; extension of the Zone of Horizontal Deviation to enable infill to rear of P21 on all levels and to the rear of B15 by 3.4m; and increase in the maximum number of affordable housing units from 123 to 126. namely, amendment to the wording of Condition 19 to refer to the submitted and relevant approved Waste Management Plans; and amendment to the wording of Condition 27 to refer to the submitted and relevant approved TraAic and Servicing Management Plans.

    Submitted 24 Sep 2026 Amendments
  • 26/01446/LBC Granted

    Development Site At Chelsea Barracks Chelsea Bridge Road London

    Temporary removal of one post of metal railing, one railing panel and four granite plinths.

    Decided 12 Mar 2026 Heritage and listed buildings
  • 26/01381/LBC Awaiting decision

    Development Site At Chelsea Barracks Chelsea Bridge Road London

    Installation of a commemorative plaque on the west elevation of the Garrison Chapel.

    Submitted 4 Mar 2026 Heritage and listed buildings
  • 25/07396/OUT Awaiting decision

    Development Site At Chelsea Barracks Chelsea Bridge Road London

    Variation of Conditions 1, 2, 3, 53, 54, 55 and 58 of planning permission dated 16 November 2018 (RN 18/04103/OUT) as amended by decisions dated 23 January and 20 October 2025 (RNs 24/08839/NMA and 25/07210/NMA) for: "Variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN: 17/07176/OUT) for the demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (Class C3), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings." Namely, the reconfiguration of Phase 5 from the consented 20 townhouses to 87 apartments (Class C3) across three blocks (Buildings 12, 13 and 14) and the associated increase in building footprint, massing and height and the omission of one basement level.

    Submitted 13 Oct 2025 Outline
  • 25/07210/NMA Granted

    Development Site At Chelsea Barracks Chelsea Bridge Road London

    Amendments to planning permission dated 16 November 2018 (RN 18/04103/OUT) as amended by decision dated 23 January 2025 (RN 24/08839/NMA) for: "Variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN: 17/07176/OUT) which itself varied conditions 1, 26, 53, 54 and 55 of planning permission dated 27 September 2016 (RN: 16/04998/OUT) for the demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (Class C3), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings. Namely, amendments including adjustment of parameter lines to P21 to form 2 plots, P21a and P21b; addition of 1.3m wide Zone of Horizontal Deviation for Articulation on P21b and P22; extension of the Zone of Horizontal Deviation to enable infill to rear of P21 on all levels and to the rear of B15 by 3.4m; and increase in the maximum number of affordable housing units from 123 to 126." Namely, the deletion of the Plan Nos section of the Schedule of the permission and the amendment of Condition 1 (Scheme Parameters) such that it lists all of the approved plans and documents currently listed in the Schedule. (See Informative 1 of this decision for amended Schedule.)

    Decided 20 Oct 2025 Amendments
  • 25/06877/NMA Granted

    Development Site At Chelsea Barracks Chelsea Bridge Road London

    Amendments to planning permission dated 16 November 2018 (RN 18/04103/OUT) for variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN 17/07176/OUT) for: "Demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (a maximum of 448 units), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings." Namely, an amendment to the wording of Condition 13 to allow the occupation of no more than 78 units within Phase 4 before requiring our confirmation that the archaeological fieldwork and development for Phase 4 has been carried out according to the approved scheme of investigation.

    Decided 6 Oct 2025 Amendments
  • 25/05857/ADFULL Awaiting decision

    Development Site At Chelsea Barracks Chelsea Bridge Road London

    Details confirming archaeological work carried out during Phase 4, pursuant to Condition 13 (part c) of planning permission dated 16 November 2018 (RN 18/04103/OUT).

    Submitted 18 Aug 2025 Full applications
  • 25/05240/EIASCR Decided

    Development Site At Chelsea Barracks Chelsea Bridge Road London

    Request for a screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for the proposed variation of conditions attached to planning permission dated 16 November 2018 (RN 18/04103/OUT) (as amended by decision dated 23 January 2025, RN 24/08839/NMA) for: "Variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN: 17/07176/OUT) which itself varied conditions 1, 26, 53, 54 and 55 of planning permission dated 27 September 2016 (RN: 16/04998/OUT) for the demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (Class C3), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings. Namely, amendments including adjustment of parameter lines to P21 to form 2 plots, P21a and P21b; addition of 1.3m wide Zone of Horizontal Deviation for Articulation on P21b and P22; extension of the Zone of Horizontal Deviation to enable infill to rear of P21 on all levels and to the rear of B15 by 3.4m; and increase in the maximum number of affordable housing units from 123 to 126." Namely, to allow for amendments to Phase 5 of the development so that it can deliver up to 100 apartments across three blocks (rather than 20 townhouses as consented).

    Decided 18 Aug 2025 Outline
  • 17/06121/MOD106 Awaiting decision

    Development Site At Chelsea Barracks Chelsea Bridge Road London

    Updated affordable housing payment bond.

    Submitted 11 Jul 2017

Timeline

Dates from the published record

  1. 18 Aug 2026

    Received by Westminster

  2. 28 Aug 2026

    Added to PlanIndex

  3. 3 Sep 2026

    Decision issued

  4. 5 Sep 2026

    Status changed to Decided

    Previously Pending.

After the decision

Westminster has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About tree works applications

Applications for works to trees cover protected trees: consent under a tree preservation order, or six weeks notice for trees in a conservation area. More in our guide to planning application types.

In Westminster

  • 26/06901/TPO Decided

    110 Maida Vale London W9 1PS

    T3 Walnut: Raise crown over the beds by approximately 2m and clear Cherry. Reduce remaining crown back to previous and most recent reduction points up to approximately 1.5m. Thin crown density evenly throughout by 20%. T4 Walnut: Reduce back to previous and most recent points of reduction up to approximately 1.5m. Thin crown density by 20%. Remove dead wood. T5 Fig: Reduce lateral growth hard back garden side by approximately 1.25-1.5m. Reduce crown height back to previous points of reduction (approximately 1.4m). T7 Mulberry: Reduce crown road side by approximately 1.2m. Raise crown road side by approximately 1.2m. Thin crown density throughout by 20%. Reduce remaining over extended branches which protrude from the main crown structure back in to the main crown.

    Received 8 Oct, published by the council 12 Oct 2026 Trees
  • 26/07241/TCA Awaiting decision

    11 Castellain Road London W9 1EY

    T1 - Mature Sycamore- Carry out a crown reduction of up to 3m in height and up to 2m laterally back to the previous, most recent established pruning points, retaining a balanced crown structure and natural form. Pruning cuts will be made to suitable growth points. T2 - Field Maple- Undertake a crown reduction of approx 2m in height and 1.5m laterally appropriate to the tree?s condition, structure and previous pruning history, whilst retaining a natural crown shape and viable growth points. Where suitable, reduce the crown to the previous reduction points, pruning back to appropriate secondary branches or growth points to create a balanced, natural-flowing canopy outline. As an Arboricultural Approved contractor (#AC2626), all works will be undertaken in accordance with BS39982010 - Tree Work - Recommendations. Reason for work: General tree maintenance

    Received 22 Oct, published by the council 23 Oct 2026 Trees
  • 26/07207/TCA Awaiting decision

    2 Motcomb Street London SW1X 8JU

    T1, T2 and T3 - Bay Laurel reduce height by approx 2-3m from tips and shorten lateral growth by 1m from tips.

    Received 21 Oct, published by the council 23 Oct 2026 Trees
  • 26/07205/TPO Awaiting decision

    Garden Enclosure Portman Square London W1H 6LJ

    T8 - CHERRY - - End-weight reduction - Specified extent Reduce crown of NE stem by 1 .5m, reducing load on decay canker and subsequent risk of failure. T22 - ACER - Prune from adjacent structure to clear lamp column by 1 meter T24 - CHERRY - - Lift low canopy - Pedestrian clearance to 4.5m over road. T37 - CHERRY - Remove faulted limb / limbs Remove lowest south facing branch to stem. G73 - CERCIS CANADENSIS - Lift low canopy - Pedestrian clearance to 2.5 m over footpath.

    Received 21 Oct, published by the council 23 Oct 2026 Trees
  • 26/07220/TCA Awaiting decision

    Overseas House Park Place London SW1A 1LR

    T1 Betula jacquemontii- Fell- This tree has out grown its position in the small herbacious border and garden, it is blocking light and the roots are suppressing the growth of other ornamental shrubs and trees- The owner would like to remove it before it gets any larger- a poor choice for such a small garden, also blocking the view in to Green park. T2 Prunus sp.- Fell As above , in addition the trees lower branches have been removed and now has impaired form, is being suppressed by the London Plane tree and it has very few blossoms in the spring. If nessessary the tree owner would be prepared to replace the two trees with a more suitable tree

    Received 21 Oct, published by the council 23 Oct 2026 Trees