Planning application
25/07210/NMA
Development Site At Chelsea Barracks Chelsea Bridge Road London
Proposal
Amendments to planning permission dated 16 November 2018 (RN: 18/04103/OUT) for Variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN: 17/07176/OUT) which itself varied conditions 1, 26, 53, 54 and 55 of planning permission dated 27 September 2016 (RN: 16/04998/OUT) for the demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (a maximum of 448 units), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings. Namely, the deletion of the Plan Nos section of the Schedule to the 2018 Permission and the amendment of Condition 1 (Scheme Parameters) of the 2018 Permission so Condition 1 then lists all of the plans and documents currently listed in the Plan Nos section of the Schedule to the 2018 Permission.
As published by the council, reference 25/07210/NMA
Timeline
Dates from the published record
-
6 Oct 2025
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
25/05857/ADFULL Awaiting decision
Development Site At Chelsea Barracks Chelsea Bridge Road London
Details confirming archaeological work carried out during Phase 4, pursuant to Condition 13 (part c) of planning permission dated 16 November 2018 (RN 18/04103/OUT).
-
25/05240/EIASCR Decided
Development Site At Chelsea Barracks Chelsea Bridge Road London
Request for a screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for the proposed variation of conditions attached to planning permission dated 16 November 2018 (RN 18/04103/OUT) (as amended by decision dated 23 January 2025, RN 24/08839/NMA) for: "Variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN: 17/07176/OUT) which itself varied conditions 1, 26, 53, 54 and 55 of planning permission dated 27 September 2016 (RN: 16/04998/OUT) for the demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (Class C3), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings. Namely, amendments including adjustment of parameter lines to P21 to form 2 plots, P21a and P21b; addition of 1.3m wide Zone of Horizontal Deviation for Articulation on P21b and P22; extension of the Zone of Horizontal Deviation to enable infill to rear of P21 on all levels and to the rear of B15 by 3.4m; and increase in the maximum number of affordable housing units from 123 to 126." Namely, to allow for amendments to Phase 5 of the development so that it can deliver up to 100 apartments across three blocks (rather than 20 townhouses as consented).
-
25/07396/OUT Awaiting decision
Development Site At Chelsea Barracks Chelsea Bridge Road London
Variation of Conditions 1, 2, 3, 53, 54, 55 and 58 of planning permission dated 16 November 2018 (RN 18/04103/OUT) as amended by decisions dated 23 January and 20 October 2025 (RNs 24/08839/NMA and 25/07210/NMA) for: "Variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN: 17/07176/OUT) for the demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (Class C3), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings." Namely, the reconfiguration of Phase 5 from the consented 20 townhouses to 87 apartments (Class C3) across three blocks (Buildings 12, 13 and 14) and the associated increase in building footprint, massing and height and the omission of one basement level.
-
26/02758/FULL Awaiting decision
8 Whistler Square London SW1W 8BW
Erection of a pergola on the south east corner of 6th floor terrace.
-
25/07106/FULL Awaiting decision
8 Whistler Square London SW1W 8BW
Revision of the external illumination of the Level 6 terrace of 8 Whistler Square from uplighters between each column to uplighters at centre of each column.
-
26/02759/FULL Awaiting decision
8 Whistler Square London SW1W 8BW
Erection of decorative privacy screens on the east and west elevations of 6th floor terrace.
Other amendments applications
In Westminster
-
26/04962/NMA Awaiting decision
Serpentine Gallery Kensington Gardens Exhibition Road London W2 3XA
Amendments to planning permission dated 27 February 2025 (RN: 24/08940/FULL) for the installation of temporary art sculpture from 24 March 2025 to 09 September 2025; NAMELY to extend the temporary planning consent until 21st March 2027.
-
26/04951/NMA Awaiting decision
43 - 45 Portman Square London W1H 6LY
Amendments to planning permission dated 22 April 2026 (25/06153/FULL) for: Variation of Condition 1 of planning permission dated 7 April 2025 (24/04987/FULL) for: Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works NAMELY; to amend the wording of Condition 27 to allow basement demolition work to proceed.
-
26/04873/NMA Awaiting decision
Orbis House 5 Mansfield Street London W1G 9NG
Amendments to planning permission dated 05 September 2024 (RN: 24/01895/FULL) for: new courtyard surface including walk-on rooflight; window and door alterations; new window to Mansfield Mews at second floor level; new rooflights; repairs to roof and external brickwork; erection of new staircase in front area lightwell; partial infill of rear lightwell at ground floor level; erection of roof terrace; installation of PV panels at roof level; and associated works namely; to allow provision of guarding system to provide safe access for maintenance across the roof; alteration at south elevation omitting window SFW11 from the new WC, remove the existing RWP from the internal courtyard corner, removal of the existing plastic section of a redundant vent pipe at lower level and retain original lead; new cast iron rain water pipes at west elevation; and internal layout alterations at basement, ground, 2nd, 3rd floors. (Linked with 26/04876/LBC)
-
26/04870/NMA Awaiting decision
34 Park Street London W1K 2JD
Amendments to planning permission dated 8 May 2026 (25/07808/FULL) for general refurbishment and M&E upgrade of the office building namely; roof walkable skylight, GF meeting room wall mounted TV, garden bench and planters, fire lobbies, L4 glass partition, reception to hall door swing change, front lightwell electric cupboard change, wall panelling on LGF and L5, LGF modular screen, LGF courtyard window door infill, and LGF cove lighting.
-
26/04816/NMA Awaiting decision
Ebury Bridge Estate Ebury Bridge Road London SW1W 8PX
Amendments to planning permission dated 21 July 2023 (RN:23/00331/COOUT) for a mixed use development in outline for residential floorspace and ancillary residential facilities (Class C3) non-residential floorspace comprising flexible retail (Classes A1 - A4), community (Class D1), leisure (Class D2) and workspace (Class B1) floorspace; provision of basement; new pedestrian and vehicular access; and associated amenity space, open space, plant, landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works; and detailed planning consent for Blocks 7 and 8 comprising residential floorspace and ancillary residential facilities (Class C3); provision of a basement; new pedestrian and vehicular access; and associated amenity space landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works, namely amendments to the approved Masterplan Phasing to incorporate enabling works and piling in Phase 2a and 3a.