Skip to content
PlanIndex Get alerts
Menu

Planning application

113 Warwick Avenue London W9 2PP

Awaiting decision Westminster 26/05588/FULL Full applications

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a single storey rear extension to the side of the original outrigger; Replacement of all single glazed sash windows with traditional box sash double glazed units; Repositioning of the lower ground floor entrance door under the front steps; and Replacement of front step asphalt with stone steps and risers.

As published by the council, reference 26/05588/FULL

Application record

Reference
26/05588/FULL
Category
Full applications
Status
Pending
Received
17 Aug 2026
Validated
17 Aug 2026
Postcode
W9 2PP

Timeline

Dates from the published record

  1. 17 Aug 2026

    Received by Westminster

  2. 22 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 12 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 60 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Third Floor Flat 67 Warwick Avenue London W9 2PP

    26/05411/CLEUD Submitted 10 Aug 2026 0m away

    88% historically approved · decision due ~5 Oct

    Certificate of Lawful Existing Use or Development in respect of the existing decked roof terrace and balustrade (the operational development) situated above the rear closet wing, as shown on the accompanying plan, together with the associated use of the flat roof as a roof terrace.

    Awaiting decision Lawful development
  • 119 Warwick Avenue London W9 2PP

    26/04732/TCA Submitted 15 Jul 2026 0m away

    100% historically approved · decision due ~9 Sep

    T1- Acacia pravissima complete removal

    Awaiting decision Trees
  • 1 Elnathan Mews London W9 2JE

    26/05883/FULL Submitted 27 Aug 2026 36m away

    87% historically approved · decision due ~22 Oct

    Use of part of the main roof as a roof terrace for amenity purposes. Permanent planters with evergreen hedging along the full length of the front elevation at roof level, Including high metal railings to the remainder of the roof for emergency escape use only.

    Awaiting decision Full applications
  • 76 Warwick Avenue London W9 2PU

    26/00746/FULL Submitted 9 Feb 2026 38m away

    Installation of a metal handrail to entrance steps up to the main front door.

    Granted Full applications 14 docs
  • 7A Pindock Mews London W9 2PY

    25/06168/ADFULL Submitted 29 Aug 2025 55m away

    Detail elevation drawings, section drawings of the new windows and doors and a sample of the glass (at least 300mm square) and window restrictors to allow maximum opening of 20cm pursuant to condition 4 and 5 of planning permission dated 28th July 2025 (RN:25/03892/FULL)

    Refused Full applications Windows or glazing 11 docs
  • 11 Pindock Mews London W9 2PY

    26/01581/ADFULL Submitted 11 Mar 2026 55m away

    87% historically approved · decision due ~6 May

    Details of sample of the glass (at least 300mm square) for all windows and provide a manufacturer's specification or drawing of the restrictors to be fitted to the dormer windows to prevent them being fully openable pursuant to condition 5 of planning permission dated 31st October 2024 (RN: 24/04993/FULL).

    Awaiting decision Full applications Loft or dormer Windows or glazing 3 docs

In Westminster

  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05900/FULL Awaiting decision

    68 Edgware Road London W2 2EG

    Installation of an access hatch window within an existing door to the sites rear elevation fronting Stourcliffe Street to facilitate takeaway collections via Deliveroo from the restaurant. (68-74 Edgware Road).

    28 Aug 2026 Full applications
  • 26/05907/FULL Awaiting decision

    St Augustines Primary School Kilburn Park Road London NW6 5XA

    Installation of district heating network pipework (Phase 1) and installation of individual building connection pipework and associated Glass Reinforced Plastic (GRP) cabinets in connection with the proposed South Kilburn District Heating Network, including associated external and internal works.

    28 Aug 2026 Full applications
  • 26/05914/FULL Awaiting decision

    66 - 68 Brewer Street London W1F 9TP

    Installation of a retractable Dutch-style awning/canopy above the existing Brewer Street doorway. (NB: Venue NAME on canopy, subject to separate advert application.)

    28 Aug 2026 Full applications
  • 26/05899/FULL Awaiting decision

    Flat 6 39 Wimpole Street London W1G 8YE

    Replacement of a painted timber roof top roof light to match existing. (Linked with26/05602/LBC)

    28 Aug 2026 Full applications