Skip to content
PlanIndex Get alerts
Menu

Planning application

95 Park Lane London W1K 7TE

Awaiting decision Westminster 26/05338/LBC Heritage and listed buildings

Relates to 26/05337/FULL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of 6no. outdoor ASHP and AC units (Linked with 26/05337/FULL)

As published by the council, reference 26/05338/LBC

Application record

Reference
26/05338/LBC
Category
Heritage and listed buildings
Status
Pending
Received
6 Aug 2026
Validated
18 Aug 2026
Postcode
W1K 7TE

Site history

Applications at this address on the Westminster register

This site has had 5 applications since 2025: 1 approved, 0 refused.

  • 26/05337/FULL Awaiting decision

    95 Park Lane London W1K 7TE

    Variation of Condition 1 of planning permission dated 17 July 2025 (RN: 25/02688/FULL) for, 'Repair and replacement of windows on the front and rear elevations, installation of plant at main roof level, replacement of roof coverings and lift and internal alterations at all floor levels'. NAMELY, to allow the installation of 6no. outdoor smaller units clustered on the east side of the roof in two groups rather than arranged against the party wall. (Application under Section 73). (Linked with 26/05338/LBC)

    Submitted 6 Aug 2026 Full applications
  • 26/01957/ADLBC Awaiting decision

    95 Park Lane London W1K 7TE

    Details of the installation of screening surrounding each grouping of plant to be coloured dark grey and construction details to include materiality and opening mechanisms of the access hatch pursuant to Conditions 3 and 5 of listed building consent dated 17 July 2025 (RN25/03227/LBC) (Linked 26/01956/ADFULL)

    Submitted 25 Mar 2026 Conditions
  • 26/01956/ADFULL Awaiting decision

    95 Park Lane London W1K 7TE

    Details of the installation of screening surrounding each grouping of plant to be coloured dark grey and construction details to include materiality and opening mechanisms of the access hatch pursuant to Conditions 6 and 8 of planning permission dated 17 July 2025 (RN25/02688/FULL) (Linked 26/01957/ADLBC)

    Submitted 25 Mar 2026 Full applications
  • 25/08902/ADLBC Granted

    95 Park Lane London W1K 7TE

    Details of damp-proofing system pursuant to condition 3 of listed building consent dated 22 August 2023 (RN: 23/03566/LBC)

    Decided 26 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 6 Aug 2026

    Received by Westminster

  2. 18 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 18 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/05337/FULL Awaiting decision

    95 Park Lane London W1K 7TE

    Variation of Condition 1 of planning permission dated 17 July 2025 (RN: 25/02688/FULL) for, 'Repair and replacement of windows on the front and rear elevations, installation of plant at main roof level, replacement of roof coverings and lift and internal alterations at all floor levels'. NAMELY, to allow the installation of 6no. outdoor smaller units clustered on the east side of the roof in two groups rather than arranged against the party wall. (Application under Section 73). (Linked with 26/05338/LBC)

    Submitted 6 Aug 2026 Full applications

1 later application on the register refers to this one:

  • 26/05337/FULL Awaiting decision

    95 Park Lane London W1K 7TE

    Variation of Condition 1 of planning permission dated 17 July 2025 (RN: 25/02688/FULL) for, 'Repair and replacement of windows on the front and rear elevations, installation of plant at main roof level, replacement of roof coverings and lift and internal alterations at all floor levels'. NAMELY, to allow the installation of 6no. outdoor smaller units clustered on the east side of the roof in two groups rather than arranged against the party wall. (Application under Section 73). (Linked with 26/05338/LBC)

    Submitted 6 Aug 2026 Full applications

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 87 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 95 Park Lane London W1K 7TE

    26/05337/FULL Submitted 6 Aug 2026 0m away

    87% historically approved · decision due ~13 Oct

    Variation of Condition 1 of planning permission dated 17 July 2025 (RN: 25/02688/FULL) for, 'Repair and replacement of windows on the front and rear elevations, installation of plant at main roof level, replacement of roof coverings and lift and internal alterations at all floor levels'. NAMELY, to allow the installation of 6no. outdoor smaller units clustered on the east side of the roof in two groups rather than arranged against the party wall. (Application under Section 73). (Linked with 26/05338/LBC)

    Awaiting decision Full applications Windows or glazing
  • 95 Park Lane London W1K 7TE

    26/01957/ADLBC Submitted 25 Mar 2026 2m away

    90% historically approved · decision due ~20 May

    Details of the installation of screening surrounding each grouping of plant to be coloured dark grey and construction details to include materiality and opening mechanisms of the access hatch pursuant to Conditions 3 and 5 of listed building consent dated 17 July 2025 (RN25/03227/LBC) (Linked 26/01956/ADFULL)

    Awaiting decision Conditions 6 docs
  • 95 Park Lane London W1K 7TE

    26/01956/ADFULL Submitted 25 Mar 2026 2m away

    87% historically approved · decision due ~20 May

    Details of the installation of screening surrounding each grouping of plant to be coloured dark grey and construction details to include materiality and opening mechanisms of the access hatch pursuant to Conditions 6 and 8 of planning permission dated 17 July 2025 (RN25/02688/FULL) (Linked 26/01957/ADLBC)

    Awaiting decision Full applications 5 docs
  • 95 Park Lane London W1K 7TE

    25/08902/ADLBC Submitted 8 Dec 2025 2m away

    Details of damp-proofing system pursuant to condition 3 of listed building consent dated 22 August 2023 (RN: 23/03566/LBC)

    Granted Conditions 8 docs
  • 94 Park Lane London W1K 7TD

    26/01955/ADLBC Submitted 25 Mar 2026 5m away

    90% historically approved · decision due ~20 May

    Details of the installation of screening surrounding the plant to be coloured dark grey pursuant to Condition 4 of listed building consent dated 15 August 2025 (RN25/03030/LBC) (Linked 26/01952/ADFULL)

    Awaiting decision Conditions 2 docs
  • 94 Park Lane London W1K 7TD

    26/01952/ADFULL Submitted 25 Mar 2026 5m away

    87% historically approved · decision due ~20 May

    Details of the installation of screening surrounding the plant to be coloured dark grey pursuant to Condition 6 of planning permission dated 15 August 2025 (RN25/02686/FULL) (Linked 26/01955/ADLBC)

    Awaiting decision Full applications 3 docs

In Westminster

  • 26/06025/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06024/FULL)

    3 Sep 2026 Heritage and listed buildings
  • 26/05971/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Automation of door at principal floor level.

    1 Sep 2026 Heritage and listed buildings
  • 26/05962/LBC Awaiting decision

    Royal Albert Hall Kensington Gore London SW7 2AP

    Variation of condition 2 of listed building consent dated 26 March 2024 (RN: 24/00820/LBC) for the: Erect temporary access scaffolding platform at high level in the auditorium to inspect the condition of the plaster ceilings and main cornices. NAMELY, to allow the gantry to remain in place until December 2028.

    1 Sep 2026 Heritage and listed buildings
  • 26/05970/LBC Awaiting decision

    Norman Shaw Building South Victoria Embankment London SW1A 2HZ

    Replacement and installation of 16 electronic access control systems to Norman Shaw South

    1 Sep 2026 Heritage and listed buildings
  • 26/05943/LBC Awaiting decision

    1 Barton Street London SW1P 3NG

    Use of the building as F1(a) Education, along with associated internal and external alterations. (Linked with 26/05942/FULL)

    1 Sep 2026 Heritage and listed buildings