Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Fitzmaurice Place London W1J 5JD

Awaiting decision Westminster 26/05080/FULL Full applications

Works: Extension Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of the sixth floor lift room on the west wing of the building, the erection of a two storey extension at roof level to the west wing of the building to provide additional bedrooms to the Lansdowne Club (suis generis), including the extension to existing lift shaft, relocation of plant at roof level, installation of solar panels and other associated internal and external works. (Linked with 26/05081/LBC)

As published by the council, reference 26/05080/FULL

Application record

Reference
26/05080/FULL
Category
Full applications
Status
Pending
Received
29 Jul 2026
Validated
29 Jul 2026
Postcode
W1J 5JD

Timeline

Dates from the published record

  1. 29 Jul 2026

    Received by Westminster

  2. 9 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 23 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Fitzmaurice Place London W1J 5JD

    26/04096/LBC Submitted 22 Jun 2026 0m away

    90% historically approved · decision due ~17 Aug

    Reinstatement works to the fencing room and the squash court following water ingress damage.

    Awaiting decision Heritage and listed buildings
  • 9 Fitzmaurice Place London W1J 5JD

    26/05081/LBC Submitted 29 Jul 2026 0m away

    90% historically approved · decision due ~23 Sep

    Demolition of the sixth floor lift room on the west wing of the building, the erection of a two storey extension at roof level to the west wing of the building to provide additional bedrooms to the Lansdowne Club (suis generis), including the extension to existing lift shaft, relocation of plant at roof level, installation of solar panels and other associated internal and external works. (Linked with 26/05080/FULL)

    Awaiting decision Heritage and listed buildings Extension Demolition
  • 9 Fitzmaurice Place London W1J 5JD

    26/05082/FULL Submitted 29 Jul 2026 0m away

    87% historically approved · decision due ~23 Sep

    Removal of temporary canopy within courtyard and installation of replacement permanent canopy with a retractable glass roof, together with the installation of a new bar, installation of associated plant, creation of entrance to the courtyard via the Long Gallery and other associated works. (Linked to 26/05083/LBC)

    Awaiting decision Full applications
  • 9 Fitzmaurice Place London W1J 5JD

    26/05083/LBC Submitted 29 Jul 2026 0m away

    90% historically approved · decision due ~23 Sep

    Removal of temporary canopy within courtyard and installation of replacement permanent canopy with a retractable glass roof, together with the installation of a new bar, installation of associated plant, creation of entrance to the courtyard via the Long Gallery and other associated works. (Linked to 26/05082/FULL)

    Awaiting decision Heritage and listed buildings
  • 9 Fitzmaurice Place London W1J 5JD

    22/02006/LBC Submitted 24 Mar 2022 10m away

    Repairs and renovation including, brickwork repairs, re-roofing of flat roofs, repairs to the slated mansards and lead dormers, steel window replacement, cleaning of the front facade, minor stone repairs and replacement of the existing sun room glazed screen.

    Granted Heritage and listed buildings Loft or dormer Windows or glazing 55 docs
  • 50 Charles Street London W1J 5EP

    11/07728/FULL Submitted 12 Aug 2011 25m away

    Installation of a new air conditioning unit to front lightwell of the property.

    Granted Full applications 8 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications