Planning application

26/04888/ADFULL

Basement To First Floor Rear 63 Lisson Street London NW1 5DA

Awaiting decision Westminster Approval of Details (Full PP)

Proposal

Detailed drawings showing the details of the lower ground floor doors, details of section drawings of the new front windows at scale 1:10, details in writing appropriate arrangements to secure measures to mitigate the potential increased demand for on-street residents car parking in the vicinity of the site, details of how waste is to be stored on site and how materials for recycling will be stored separately, detailed drawings and specifications of screening to courtyard at ground floor level and details of detailed site investigation pursuant to condition 4, 5, 8, 10, 12 & 13 of planning permission dated 31st July 2025 (RN:25/03614/FULL)

As published by the council, reference 26/04888/ADFULL

Timeline

Dates from the published record

  1. 21 Jul 2026

    Received by Westminster

  2. 29 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/08773/FULL Awaiting decision

    63 Lisson Street London NW1 5DA

    Erection of mansard roof extension to facilitate 1-bed self-contained flat, together with the replacement of existing fenestration and creation of a third floor terrace to the rear and associated external alterations.

    2 Dec 2025 13m away Full applications
  • 25/08845/FULL Granted

    Flat 5 Aquarius House 57A Lisson Street London NW1 5DA

    Replacement of the existing single glazed timber sash windows with double glazed timber sash windows to the front and rear elevations.

    5 Dec 2025 13m away Full applications
  • 26/03089/FULL Awaiting decision

    House 1 42 Bell Street London NW1 5AW

    Erection of two additional floors and installation of a lift and new stairs to central courtyard at first floor level and conversion of the three five-storey houses to form nine new flats together with alterations to stairs and installation of bin and cycle stores within the central courtyard of the site.

    11 May 2026 26m away Full applications
  • 26/03881/FULL Awaiting decision

    Basement Front And Ground Floor Front 54 Lisson Street London NW1 5DF

    Use of the lower ground floor as residential units (Class C3)

    12 Jun 2026 33m away Full applications
  • 26/01811/FULL Awaiting decision

    First Floor 50 Lisson Street London NW1 5DF

    Change of use from office to residential dwelling (C3).

    19 Mar 2026 38m away Full applications
  • 20/00153/ADFULL Refused

    Basement And Ground Floor 67-69 Bell Street London NW1 6SX

    Details of all new doors and windows and railings to the lightwells to the front elevation pursuant to planning permission dated 29th May 2019 (RN:18/10729).

    10 Jan 2020 67m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications