Planning application
26/04648/FULL
96 Star Street London W2 1QF
Proposal
Infill of front basement lightwell to form a new ensuite shower room; construction of a modest rear basement/lightwell extension; formation of a rear basement ensuite bathroom and ground floor WC; associated internal alterations, drainage works, and traditional repair and making good works.
As published by the council, reference 26/04648/FULL
Timeline
Dates from the published record
-
10 Jul 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04194/LBC Awaiting decision
96 Star Street London W2 1QF
Front basement lightwell infill to form a new ensuite shower room; construction of a modest rear basement/lightwell extension; formation of a rear basement ensuite bathroom and ground floor WC, associated internal alterations, drainage works, and traditional repair and making good works.
-
25/06772/LBC Awaiting decision
32 Sussex Gardens London W2 1UL
Replacement and alterations to roof; masonry restoration; Installation of replacement timber sash windows, balcony and french doors; railing repairs; removal of external cabling; rainwater goods replacement; retention of aerial & satellite dish; external repainting and other associated works. Linked with 25/06771/FULL
-
25/06771/FULL Awaiting decision
32 Sussex Gardens London W2 1UL
Replacement and alterations to roof; masonry restoration; Installation of replacement timber sash windows, balcony and french doors; railing repairs; removal of external cabling; rainwater goods replacement; retention of aerial & satellite dish; external repainting and other associated works. Linked with 25/06772/LBC
-
26/03734/LBC Awaiting decision
Upper Maisonette 104 Star Street London W2 1QF
Internal alterations.
-
26/03154/FULL Awaiting decision
24 Sussex Gardens London W2 1UL
Replacement of aluminium windows with double-glazed timber-framed windows; installation of twelve AC condensor units to rear elevation; and internal layout changes. [Linked to 26/03155/LBC]
-
26/03155/LBC Awaiting decision
24 Sussex Gardens London W2 1UL
Replacement of aluminium windows with double-glazed timber-framed windows; installation of twelve AC condensor units to rear elevation; and internal layout changes. [Linked to 26/03154/FULL]
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.