Planning application
26/04244/FULL
5 Dryden Street London WC2E 9NA
Proposal
Replacement shopfront and external retractable awning
As published by the council, reference 26/04244/FULL
Timeline
Dates from the published record
-
26 Jun 2026
Received by Westminster
-
16 Jul 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00305/CLOPUD Awaiting decision
81 - 82 Long Acre London WC2E 9NG
Use of the upper floors as short-term letting rooms ancillary to the public house.
-
25/07334/FULL Awaiting decision
81 - 82 Long Acre London WC2E 9NG
Installation of two flag poles to the front facade of the public house at first-floor level.
-
26/04430/ADV Awaiting decision
12 Dryden Street London WC2E 9NA
Display of a non-illuminated A-board measuring 1.56m x 0.65m; and a non-illuminated decorative trolley measuring 0.95m x 0.56m.
-
26/03989/ADFULL Awaiting decision
5 Dryden Street London WC2E 9NA
Details of fume and smell mitigation pursuant to condition 9 of planning permission granted at appeal dated 20 August 2024 (RN: 24/00026/TPREF).
-
25/06456/ADV Granted
80 Long Acre London WC2E 9NG
Display of one externally illuminated projecting sign at ground floor level measuring 0.55m x 0.55m.
-
25/08116/ADV Awaiting decision
36 Drury Lane London WC2B 5RR
Display of 3 x externally illuminated fascia signs measuring 9.60m x 0.45m, 8.50m x 0.45m, and 0.60m x 0.35m; 1 x externally illuminated hanging sign measuring 1.20m x 0.80m; 1 x externally illuminated vertical sign measuring 6.56m x 1.50m; and 1 x internally illuminated menu box measuring 0.30m x 0.21m. (Linked with 25/08115/LBC)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.