Planning application
26/04106/FULL
36 Droop Street London W10 4DQ
Proposal
Replacement of front and rear elevation windows with double glazed timber windows.
As published by the council, reference 26/04106/FULL
Timeline
Dates from the published record
-
22 Jun 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/05293/FULL Granted
24 Droop Street London W10 4DQ
Erection of single storey ground floor side infill extension, facade alterations and associated works
-
26/01467/TCA Granted
4 Droop Street London W10 4DQ
1 x Japanese maple (T1): Reduce height by 1.25m and reduce lateral branches by 0.5.
-
26/02210/LBC Awaiting decision
Queens Park Primary School Droop Street London W10 4DQ
External and internal works including, brickwork and repointing remedial works, embedded steel beams remedial works (roof level), repointing and repairs to low level boundary wall (Enbrook Street), removal of defective render to brick piers, repointing or brickwork replacement (as necessary) and re-render, strip of existing flat roof coverings and replacement with new built-up roofing system, with additional insulation, removal of seven existing rooflights and installation of seven new rooflights, refurbishment of all flat roof rainwater goods including downpipes and hoppers, installation new equipment, relocatation of existing fire alarm equipment, installation of new emergency lighting provision, replacement of non-compliant fire signage and installation of new emergency exit signs, general BWIC with fire works, including penetrations for wiring and containment and making good around new works and repairs to various existing fire doors, replacement of non-compliant door sets and leak detection survey and targeted opening up works, lintel remedial works, internal redecorations, parquet flooring repairs. (Linked to 26/02209/FULL)
-
26/02209/FULL Awaiting decision
Queens Park Primary School Droop Street London W10 4DQ
External and internal works including, brickwork and repointing remedial works, embedded steel beams remedial works (roof level), repointing and repairs to low level boundary wall (Enbrook Street), removal of defective render to brick piers, repointing or brickwork replacement (as necessary) and re-render, strip of existing flat roof coverings and replacement with new built-up roofing system, with additional insulation, removal of seven existing rooflights and installation of seven new rooflights, refurbishment of all flat roof rainwater goods including downpipes and hoppers, installation new equipment, relocatation of existing fire alarm equipment, installation of new emergency lighting provision, replacement of non-compliant fire signage and installation of new emergency exit signs, general BWIC with fire works, including penetrations for wiring and containment and making good around new works and repairs to various existing fire doors, replacement of non-compliant door sets and leak detection survey and targeted opening up works, lintel remedial works, internal redecorations, parquet flooring repairs. (Linked to 26/02210/LBC)
-
CL/25/06645 Granted
1 Alderson Street, London, W10 5JY
Proposed remedial works at Chapter Portobello, 1 Alderson Street: removal of complete render system including all paper faced insulation and subframing, all timber particle sheathing boards including any existing intumescent cavity barriers in the internal courtyard elevations; installation of new cavity barriers, weatherboard, sealant, insulation and replacement render (Certificate of Lawful Proposed Use / Development)
-
25/08122/COFUL Awaiting decision
The St Marylebone Bridge School 17 - 23 Third Avenue London W10 4RS
Use of 17-23 Third Avenue as a Family Hub with associated community spaces (Sui Generis Use Class), alongside the associated refurbishment and alteration of the existing building as well as the erection of a new building and associated infrastructure to support the Family Hub including Air Source Heat Pumps, cycle and bin stores. Works to tree's.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.