Planning application
Development Site At Millbank Complex 21 - 30 Millbank London SW1P 4QP
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Deed of Variation to the S106 Agreement attached to the planning permission (LPA ref 18/09095/FULL) associated with the redevelopment of the Millbank Complex, 21-30 Millbank, London SW1 4QP (the Site).
As published by the council, reference 26/04085/MOD106
Application record
- Reference
- 26/04085/MOD106
- Type
- Modification or Discharge of a S106
- Status
- Pending
- Received
- 22 Jun 2026
- Validated
- 28 Aug 2026
- Ward
- Vincent Square
- Postcode
- SW1P 4QP
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2026.
-
26/05066/LBC Awaiting decision
Development Site At Millbank Complex 21 - 30 Millbank London SW1P 4QP
Relocation of the Skybar to the top of the Y-Building and associated layout changes; introduction of fire breaks to separate the Y-Building from the tower; retention of the existing cores within the Tower; and reduction of basement size dig as well as separation from Millbank Court, a High-Risk Building. (Linked with 26/02369/NMA)
-
26/02369/NMA Awaiting decision
Development Site At Millbank Complex 21 - 30 Millbank London SW1P 4QP
Amendments to planning permission dated 14th April 2022 (RN 18/09095/FULL) for the Variation of Condition 1 and 43 of planning permission dated 28th June 2016 (15/07756/FULL) for 'Refurbishment and replacement of facades and erection of 2 additional floors and plant enclosure to both Millbank Tower and 1 additional floor to the Y buildings; excavation of basement levels; demolition of rear car park in association with re-landscaping and reconfiguration of wider site; all in association with the use of the Tower as 207 private residential flats (Class C3) and Skybar (ancillary to adjacent Class C1), the south podium and part of tower as an arts / cultural facility (Class D1) and the north podium and Y buildings as a hotel (Class C1) with restaurant, bar and café at ground floor level. Use of roof of podium building as a terrace with associated alterations. NAMELY, The introduction of a structural exclusion zones between the Y Building and the Residential Tower to create a fire break between the two uses, responding to the requirements of the Building Safety Act 2022; Alterations to the proposed car parking layout and a reduction in the proposed number of car parking spaces; omission of basement level 2 under the Y building and basement level 3, as a result of the change to the plant requirement, servicing strategy and automated parking system; Alterations to the quantum and mix of residential units to optimise the Site, which includes the addition of six residential units; omission of Condition 40, to regularise the conditions in line with the revised energy strategy secured in (RN 25/01128/NMA)
Timeline
Dates from the published record
-
22 Jun 2026
Received by Westminster
-
28 Aug 2026
Validated
Checked as complete and ready for consideration.
-
14 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 65 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,258 applications on PlanIndex · across 37 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided condition discharge and variation applications in a median of 42 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Development Site At Millbank Complex 21 - 30 Millbank London SW1P 4QP
93% historically approved · decision due ~5 Jun
Amendments to planning permission dated 14th April 2022 (RN 18/09095/FULL) for the Variation of Condition 1 and 43 of planning permission dated 28th June 2016 (15/07756/FULL) for 'Refurbishment and replacement of facades and erection of 2 additional floors and plant enclosure to both Millbank Tower and 1 additional floor to the Y buildings; excavation of basement levels; demolition of rear car park in association with re-landscaping and reconfiguration of wider site; all in association with the use of the Tower as 207 private residential flats (Class C3) and Skybar (ancillary to adjacent Class C1), the south podium and part of tower as an arts / cultural facility (Class D1) and the north podium and Y buildings as a hotel (Class C1) with restaurant, bar and café at ground floor level. Use of roof of podium building as a terrace with associated alterations. NAMELY, The introduction of a structural exclusion zones between the Y Building and the Residential Tower to create a fire break between the two uses, responding to the requirements of the Building Safety Act 2022; Alterations to the proposed car parking layout and a reduction in the proposed number of car parking spaces; omission of basement level 2 under the Y building and basement level 3, as a result of the change to the plant requirement, servicing strategy and automated parking system; Alterations to the quantum and mix of residential units to optimise the Site, which includes the addition of six residential units; omission of Condition 40, to regularise the conditions in line with the revised energy strategy secured in (RN 25/01128/NMA)
Awaiting decision Amendments New dwelling Demolition 46 docs -
Development Site At Millbank Complex 21 - 30 Millbank London SW1P 4QP
90% historically approved · decision due ~22 Sep
Relocation of the Skybar to the top of the Y-Building and associated layout changes; introduction of fire breaks to separate the Y-Building from the tower; retention of the existing cores within the Tower; and reduction of basement size dig as well as separation from Millbank Court, a High-Risk Building. (Linked with 26/02369/NMA)
Awaiting decision Heritage and listed buildings -
Phone Box On Pavement Outside 30 Millbank London SW1P 4DU
Display of internally illuminated LCD portrait screen measuring 2.63m x 1.34m on the pavement outside 30 Millbank. (Linked with 25/01275/FULL)
Granted Advertising 15 docs -
Millbank Court 24 John Islip Street London SW1P 4LG
Details of all new external lighting including details of lighting units and intensity of illumination pursuant to Condition 3 of planning permission dated 8 September 2011 (RN:11/05086).
Granted Full applications 2 docs -
16 John Islip Street London SW1P 4JU
87% historically approved · decision due ~7 Oct
Temporary change of use of the Parade Ground at Chelsea College of Arts from 10 September 2026 to 26 September 2026 for a Fashion Show, taking place on 21 September 2026, including the erection and dismantling of a temporary marquee and other associated works ancillary to the event.
Awaiting decision Full applications -
City Inn Westminster 30 John Islip Street London SW1P 4DD
Details of cycle parking pursuant to condition 12 of planning permission dated 22 October 2019 (RN: 19/04077/FULL)
Granted Full applications 8 docs
Other condition discharge and variation applications
In Westminster
-
26/04860/ADLBC Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 7(E) of listed building consent dated 12th February 2021 (RN: 19/07816/LBC)
-
26/04843/ADLBC Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site pursuant to Condition 6(m) of listed building consent dated 12th February 2021 (19/07816/LBC).
-
26/05026/ADLBC Awaiting decision
St James's Park The Mall London SW1A 1AA
Details of method statement for re-carving works pursuant to condition 3(i) of listed building consent dated 16 July 2026 (RN: 26/03399/LBC)
-
26/04850/ADLBC Awaiting decision
17 Belgrave Square London SW1X 8PG
Detailed drawings of garage doors, roof lantern and any new lighting and flooring in the principal rooms pursuant to condition 6 (iii) (iv) (v) of listed building 18th August 2025 (RN:25/03417/LBC)
-
25/07120/ADLBC Granted
72 - 74 Lancaster Gate London W2 3NH
Details of new and altered doors and door architraves, including external faces of lifts (detailed elevations and sections at 1:10) pursuant to Condition 3 (A) of Listed Building Consent dated 14 December 2023 (RN: 23/00772/LBC) (Linked app: 25/07088/ADFULL)