Planning application
26/03907/ADFULL
Flat 1 9 Paddington Street London W1U 5QJ
Proposal
Details of new windows pursuant to condition 2 of planning permission granted at appeal dated 06 July 2023 (RN: 22/00113/TPREF)
As published by the council, reference 26/03907/ADFULL
Timeline
Dates from the published record
-
15 Jun 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/05716/FULL Refused
7 Paddington Street London W1U 5QH
Installation of 6 external wall lights to shopfront (Retrospective).
-
25/05715/FULL Refused
7 Paddington Street London W1U 5QH
Retention of three external heaters on shopfront.
-
25/07295/FULL Awaiting decision
10 Nottingham Place London W1U 5ND
Erection of a 0.95 metre deep extension to the existing front mansard roof to enlarge dwellinghouse (Class C3); alterations to materials; and other associated works.
-
26/03314/FULL Awaiting decision
10 Nottingham Place London W1U 5ND
Installation of two external air source heat pumps within acoustic enclosure located on rear roof at second floor level.
-
25/06506/NMA Granted
10 Nottingham Place London W1U 5ND
Amendments to planning permission dated 27th February 2020 (RN:19/09024/FULL) for, 'Alterations including the erection of a single-storey roof level extension with inset terrace along the Nottingham Place frontage, part-demolition of existing basement/ground floor to create a rear lightwell/patio area, erection of a rear extension and creation of a terrace at rear first floor level, installation of a replacement screen adjoining rear lightwell at second floor level with 8 Nottingham Place; all in connection with enlargement of existing dwelling house (Class C3)'; Namely, alterations to the rear elevation.
-
25/07062/FULL Awaiting decision
10 Nottingham Place London W1U 5ND
Installation of two external Air Source Heat Pumps located at roof level.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.