Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 6 77 St George's Drive London SW1V 4DB

Awaiting decision Westminster 26/03756/FULL Full Planning Permission Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Alterations to coping stones and railings of rear 5th floor flat roof terrace to rear parapet in order to create a bigger landing in front of the existing staircase leading to the top roof terrace. (Retrospective).

As published by the council, reference 26/03756/FULL

Application record

Reference
26/03756/FULL
Type
Full Planning Permission Application
Status
Pending
Received
8 Jun 2026
Validated
8 Jun 2026
Ward
Pimlico North
Postcode
SW1V 4DB

Timeline

Dates from the published record

  1. 8 Jun 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 3 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

V + V Interni Ltd. Agent, registered in Amersham

Active · incorporated 2007 · Amersham

7 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Clevedon House 79 - 81 St George's Drive London SW1V 4DB

    25/08015/FULL Submitted 4 Nov 2025 50 yards away

    Erection of extension and installation of bifolding doors to rear lower ground floor (Flat 2, No. 79).

    Granted Full applications Extension 18 docs
  • Flat 2 97 St George's Drive London SW1V 4DB

    26/04730/ADFULL Submitted 15 Jul 2026 50 yards away

    Detailed drawings showing the inclusion of integral glazing bars within the new windows pursuant to Condition 4 of planning permission dated 5th June 2026 (RN: 26/01533/FULL)

    Refused Full applications Windows or glazing 13 docs
  • Flat 2 97 St George's Drive London SW1V 4DB

    26/06084/ADFULL Submitted 7 Sep 2026 50 yards away

    Details of the inclusion of integral glazing bars within the new windows pursuant to condition 4 of planning condition dated 5 June 2026. (RN: 26/01533/FULL)

    Decided Windows or glazing
  • Flat 2 Clevedon House 79 - 81 St George's Drive London SW1V 4DB

    26/04024/ADFULL Submitted 18 Jun 2026 50 yards away

    89% historically approved · decision due ~13 Aug

    Detailed drawings and a bio-diversity management plan in relation to the living green roof to include construction method, layout, species and maintenance regime pursuant to Condition 4 of planning permission dated 25th February 2026 (RN: 25/08015/FULL).

    Decided
  • 75 St George's Drive London SW1V 4DB

    26/06837/FULL Submitted 7 Oct 2026 50 yards away

    88% historically approved · decision due ~2 Dec

    Minor alterations to the lower ground floor garden flat, including replacement windows and doors on the rear elevation and installation of a new rooflight.

    Awaiting decision Full applications Loft or dormer Windows or glazing
  • 69 - 71 St George's Drive London SW1V 4DB

    26/03939/FULL Submitted 16 Jun 2026 50 yards away

    Replacement of the front door and renewal of the platform tiling.

    Decided Full applications

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications