Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Victoria Street London SW1H 0ET

Awaiting decision Westminster 26/03589/ADFULL Approval of Details (Full PP)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details of short stay cycle parking to show the number and location of the short stay cycle parking pursuant to condition 7 of planning permission dated 8th November 2024 (RN:24/00977).

As published by the council, reference 26/03589/ADFULL

Application record

Reference
26/03589/ADFULL
Type
Approval of Details (Full PP)
Status
Pending
Received
2 Jun 2026
Validated
2 Jun 2026
Ward
St James's
Postcode
SW1H 0ET

Site history

Applications at this address on the Westminster register

This site has had 13 applications since 2020: 8 approved, 0 refused.

  • 26/06399/ADFULL Decided

    1 Victoria Street London SW1H 0ET

    Details of samples of facing materials pursuant to condition 24 of planning permission dated 08 November 2024 (RN: 24/00977/FULL).

    Decided 29 Sep 2026
  • 26/06231/ADFULL Decided

    1 Victoria Street London SW1H 0ET

    Details of the colonnade sofit details, planters and the paving in the public realm pursuant to condition 25 of planning permission dated 8th November 2024 (RN:24/00977/FULL)

    Submitted 11 Sep 2026
  • 26/05991/ADFULL Decided

    1 Victoria Street London SW1H 0ET

    Details of bird and bat boxes pursuant to condition 51 of planning permission dated 8th November 2024 (24/00977/FULL)

    Decided 21 Oct 2026
  • 26/03590/ADFULL Awaiting decision

    1 Victoria Street London SW1H 0ET

    Detailed drawings of a hard and soft planting scheme for the ground floor public real, rain gardens and all ground floor planters which includes the number, size, species and position of trees, shrubs and the soil or other planting medium, including composition, depth, volume, drainage and crating systems, as applicable in each of the different areas of soft landscaping pursuant to conditions 22 and 23 of planning permission dated 8th November 2024 (RN:24/00977).

    Submitted 2 Jun 2026 Full applications
  • 25/09079/NMA Granted

    1 Victoria Street London SW1H 0ET

    Amendments to planning permission dated 08th November 2024 (RN 24/00977/FULL) for 'Retention of two storey basement and demolition of existing building above ground level. Construction to provide a building comprising retained basement, ground and nine upper floors for use as retail, restaurant, leisure/experience, medical (Class E (a) (b) (c) (d) (e)) and office (Class E(g)(i)) uses together with associated ancillary spaces to those uses. Provision of public realm enhancements, including new landscaping. Provision of short and long stay cycle parking, on-site servicing, refuse storage, plant and other ancillary and associated works'. Namely reduction in photovoltaics, landscape re-design at junction of Victoria Street and Great Smith Street, changes to Victoria Street elevation materials and internal adjustments to the basement cycle store layout.

    Decided 30 Apr 2026 Amendments
  • 25/08874/ADV Granted

    1 Victoria Street London SW1H 0ET

    Display of temporary hoarding

    Decided 20 Jan 2026 Advertising
  • 25/08200/ADFULL Granted

    1 Victoria Street London SW1H 0ET

    Details of a supplementary acoustic report pursuant to Condition 15 of planning permission dated 8 November 2024 (RN 24/00977/FULL)

    Decided 16 Feb 2026 Full applications
  • 25/08201/ADFULL Granted

    1 Victoria Street London SW1H 0ET

    Details of sound insulation measures and noise assessment report pursuant to Condition 17 of planning permission dated 8 November 2024 (RN 24/00977/FULL)

    Decided 16 Feb 2026 Full applications
  • 25/06643/ADFULL Granted

    1 Victoria Street London SW1H 0ET

    Details of typical bay studies for each elevation, showing façade build out, including glazing pursuant to Condition 26 of planning permission dated 8th November 2024 (RN: 24/00977/FULL).

    Decided 9 Oct 2025 Full applications
  • 25/06609/ADFULL Granted

    1 Victoria Street London SW1H 0ET

    Details of Code of Construction Practice for the construction phase pursuant to Condition 3 (C) of planning permission dated 8 November 2024 (RN: 24/00977/FULL)

    Decided 6 Oct 2025 Full applications

Timeline

Dates from the published record

  1. 2 Jun 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Newmark LLP Agent

925 applications on PlanIndex · across 40 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 1 Victoria Street London SW1H 0ET

    25/06643/ADFULL Submitted 17 Sep 2025 50 yards away

    Details of typical bay studies for each elevation, showing façade build out, including glazing pursuant to Condition 26 of planning permission dated 8th November 2024 (RN: 24/00977/FULL).

    Granted Full applications Windows or glazing 7 docs
  • 1 Victoria Street London SW1H 0ET

    25/06609/ADFULL Submitted 16 Sep 2025 50 yards away

    Details of Code of Construction Practice for the construction phase pursuant to Condition 3 (C) of planning permission dated 8 November 2024 (RN: 24/00977/FULL)

    Granted Full applications 8 docs
  • 1 Victoria Street London SW1H 0ET

    25/05816/ADFULL Submitted 18 Aug 2025 50 yards away

    Detailed sample of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 24 of planning permission dated 8th November 2024 (RN:24/00977).

    Granted Full applications Windows or glazing 7 docs
  • 1 Victoria Street London SW1H 0ET

    25/08874/ADV Submitted 8 Dec 2025 50 yards away

    Display of temporary hoarding

    Granted Advertising 3 docs
  • 1 Victoria Street London SW1H 0ET

    25/08200/ADFULL Submitted 11 Nov 2025 50 yards away

    Details of a supplementary acoustic report pursuant to Condition 15 of planning permission dated 8 November 2024 (RN 24/00977/FULL)

    Granted Full applications 7 docs
  • 1 Victoria Street London SW1H 0ET

    25/08201/ADFULL Submitted 11 Nov 2025 50 yards away

    Details of sound insulation measures and noise assessment report pursuant to Condition 17 of planning permission dated 8 November 2024 (RN 24/00977/FULL)

    Granted Full applications 7 docs

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications