Planning application
26/03494/ADFULL
Broadway Complex 55 Broadway London SW1H 0BD
Proposal
Details of approval of, in consultation with TfL, a Construction Logistics Plan (CLP) before any works (including demolition) commence on site pursuant to condition 22 of planning permission dated 23rd December 2020 (RN:19/09813).
As published by the council, reference 26/03494/ADFULL
Timeline
Dates from the published record
-
28 May 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/07812/FULL Awaiting decision
Albany House 98 Petty France London SW1H 9EA
Refurbishment, alterations and extensions including demolition of existing sixth floor to Petty France elevation and erection of three-storey roof top extension; removal of roof top plant and two storeys from the Palmer Street (tower) wing and their replacement with five storeys (net increase of three) and screened plant; central atrium extension; alterations to the Petty France facade at ground floor level, extension to the Palmer Street wing at ground floor level and improvement works to forecourt and greening; all in connection with provision of new hotel with ancillary uses (class C1).
-
26/01639/ADV Awaiting decision
102 Petty France London SW1H 9AJ
Display of non illuminated 42 lamppost banners measuring 0.785m X 2m for (Victoria BID)
-
25/07949/FULL Awaiting decision
2 - 14 Palmer Street London SW1H 0AP
Variation of conditions 1, 11, 13, 19, 20, 21, 22, 23 of planning permission dated 11 March 2020 (RN: 19/03757/FULL) for the Demolition and redevelopment of existing building to provide a nine storey building (Basement, Lower Ground, Ground + 6 upper floors) and roof level plant, providing flexible commercial units at ground floor (Classes A1/A2/A3/D2) and lower ground floor (Class D2 gym), office accommodation (Class B1a) on upper levels, with cycle parking, changing facilities, waste storage and plant at basement level. NAMELY, for the removal of the basement level, reconfiguration of the ground floor, installation of secondary escape stair, increase in cycle parking, alterations to roof level including terrace, plant and lift overrun plus associated reconfiguration of the internal layout.
-
25/07738/ADFULL Awaiting decision
19 Dacre Street London SW1H 0DJ
Details of Servicing management plan pursuant to condition 14 of planning permission dated 12th October 2017 (RN: 17/01327/FULL).
-
25/07739/ADFULL Awaiting decision
19 Dacre Street London SW1H 0DJ
Details of Customer Management Plan pursuant to condition 15 of planning permission dated 12th October 2017 (RN: 17/01327/FULL).
-
25/07737/ADFULL Awaiting decision
19 Dacre Street London SW1H 0DJ
Details of ventilation system pursuant to condition 9 of planning permission dated 12th October 2017 (RN:17/01327/FULL).
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.