Skip to content
PlanIndex Get alerts
Menu

Planning application

26/03284/NMA

Development Site At 8-10 Grafton Street, 11-14 Grafton Street And 22-24 Bruton Lane London

Awaiting decision Westminster Non-material amendments

Proposal

Amendments to planning permission dated 16th September 2022 (RN:22/00178/FULL) for Demolition of all existing buildings and redevelopment to provide a seven storey building (plus three storey basement) on Grafton Street ('Building 1') comprising flexible retail/commercial floorspace (Class E) and retail floorspace (Class E), and a further seven storey building (plus three storey basement, plant mezzanine and roof top plant) on Grafton Street ('Building 2') linked to a 12 storey building (plus two storey and part three storey basement) on Barlow Place ('Building 3') comprising up to six residential units (Class C3), a hotel and associated facilities (Class C1), flexible hotel/restaurant/bar floorspace (Class C1/E/Sui Generis) and retail floorspace (Class E), and associated provision of open space and landscaping. [SITE INCLUDES 163-164 New Bond Street and Barlow Place]. Namely, alterations to waste disposal area and relocation from basement level 01 to level 02, as well as an increase in the frequency of collections, relocation of the approved quantum of cycle parking store and associated end of trip facilities from basement level 01 to level 02, alteration of fire fighting lobby at basement 02 level, relocation of area safeguarded for a future DHN, approved under application ref. 23/03251/ADFULL from basement level 02 to level 01; and reduction in photovoltaic panels at roof level.

As published by the council, reference 26/03284/NMA

Timeline

Dates from the published record

  1. 19 May 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

Nearby applications

Within 500 metres

  • 25/05650/ADFULL Granted

    Development Site At 8-10 Grafton Street, 11-14 Grafton Street And 22-24 Bruton Lane London

    Details of a typical example of each different window type for building 1 pursuant to Condition 4 (1) (part) of planning permission dated 09 August 2022 (RN22/00178/FULL)

    12 Aug 2025 26m away Full applications
  • 25/04694/ADFULL Granted

    Development Site At 8-10 Grafton Street, 11-14 Grafton Street And 22-24 Bruton Lane London

    Details of Contamination Vertification Report pursuant to Condition 34 (Phase 4) for Phase 1 of planning permission dated 16 September 2022 (RN22/00178/FULL)

    8 Jul 2025 26m away Full applications
  • 25/08399/ADFULL Awaiting decision

    Development Site At 8-10 Grafton Street, 11-14 Grafton Street And 22-24 Bruton Lane London

    Details of an assessment demonstrating the feasibility of providing the shortfall of 24 short stay cycle parking spaces pursuant to condition 51 of planning permission dated 16th September 2022 (RN:22/00178/FULL)

    17 Nov 2025 26m away Full applications
  • 25/08398/ADFULL Awaiting decision

    Development Site At 8-10 Grafton Street, 11-14 Grafton Street And 22-24 Bruton Lane London

    Details which includes a feasibility study of the practicability of urban greening on the development, detailed drawings of a planting scheme which includes the number, size, species and position of all planting, including any trees and shrubs pursuant to condition 37 of planning permission dated 16th September 2022 (RN:22/00178/FULL)

    17 Nov 2025 26m away Full applications
  • 25/07043/FULL Awaiting decision

    Statue Of The Allies New Bond Street London

    Temporary removal, secure storage and reinstatement of Churchill and Roosevelt Statue, bench and plaques outside 163-164 New Bond Street; the removal of the kiosk outside 163-164 New Bond Street, temporary relocation to Clifford Street, and eventual reinstatement; and other associated works.

    1 Oct 2025 26m away Full applications
  • 25/07352/NMA Awaiting decision

    Development Site At 8-10 Grafton Street, 11-14 Grafton Street And 22-24 Bruton Lane London

    Amendments to planning permission dated 16th September 2022 (RN 22/00178/FULL) for the Demolition of all existing buildings and redevelopment to provide a seven storey building (plus three storey basement) on Grafton Street ('Building 1') comprising flexible retail/commercial floorspace (Class E) and retail floorspace (Class E), and a further seven storey building (plus three storey basement, plant mezzanine and roof top plant) on Grafton Street ('Building 2') linked to a 12 storey building (plus two storey and part three storey basement) on Barlow Place ('Building 3') comprising up to six residential units (Class C3), a hotel and associated facilities (Class C1), flexible hotel/restaurant/bar floorspace (Class C1/E/Sui Generis) and retail floorspace (Class E), and associated provision of open space and landscaping. [SITE INCLUDES 163-164 New Bond Street and Barlow Place] NAMELY, to amend the wording of Condition 10 to read, all pre-commencement requirements of condition 10 have been satisfied in respect of Phase 1 and that the development of Phase 1 has been implemented in that context; Page 3 that the ongoing and remaining development of Phase 1 is required to be undertaken in accordance with the approved details for Phase 1 (23/07030/ADFULL); that remaining development forming part of the demolition phase of Phase 2 will be undertaken in accordance with the approved demolition details for Phase 2 (22/06801/ADFULL); and that the construction phase of Phase 2 shall not commence until the requisite details under Condition 10 have been submitted to and approved by the local authority.

    10 Oct 2025 26m away Amendments

In Westminster

  • 26/04962/NMA Awaiting decision

    Serpentine Gallery Kensington Gardens Exhibition Road London W2 3XA

    Amendments to planning permission dated 27 February 2025 (RN: 24/08940/FULL) for the installation of temporary art sculpture from 24 March 2025 to 09 September 2025; NAMELY to extend the temporary planning consent until 21st March 2027.

    24 Jul 2026 Amendments
  • 26/04951/NMA Awaiting decision

    43 - 45 Portman Square London W1H 6LY

    Amendments to planning permission dated 22 April 2026 (25/06153/FULL) for: Variation of Condition 1 of planning permission dated 7 April 2025 (24/04987/FULL) for: Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works NAMELY; to amend the wording of Condition 27 to allow basement demolition work to proceed.

    23 Jul 2026 Amendments
  • 26/04873/NMA Awaiting decision

    Orbis House 5 Mansfield Street London W1G 9NG

    Amendments to planning permission dated 05 September 2024 (RN: 24/01895/FULL) for: new courtyard surface including walk-on rooflight; window and door alterations; new window to Mansfield Mews at second floor level; new rooflights; repairs to roof and external brickwork; erection of new staircase in front area lightwell; partial infill of rear lightwell at ground floor level; erection of roof terrace; installation of PV panels at roof level; and associated works namely; to allow provision of guarding system to provide safe access for maintenance across the roof; alteration at south elevation omitting window SFW11 from the new WC, remove the existing RWP from the internal courtyard corner, removal of the existing plastic section of a redundant vent pipe at lower level and retain original lead; new cast iron rain water pipes at west elevation; and internal layout alterations at basement, ground, 2nd, 3rd floors. (Linked with 26/04876/LBC)

    21 Jul 2026 Amendments
  • 26/04870/NMA Awaiting decision

    34 Park Street London W1K 2JD

    Amendments to planning permission dated 8 May 2026 (25/07808/FULL) for general refurbishment and M&E upgrade of the office building namely; roof walkable skylight, GF meeting room wall mounted TV, garden bench and planters, fire lobbies, L4 glass partition, reception to hall door swing change, front lightwell electric cupboard change, wall panelling on LGF and L5, LGF modular screen, LGF courtyard window door infill, and LGF cove lighting.

    21 Jul 2026 Amendments
  • 26/04816/NMA Awaiting decision

    Ebury Bridge Estate Ebury Bridge Road London SW1W 8PX

    Amendments to planning permission dated 21 July 2023 (RN:23/00331/COOUT) for a mixed use development in outline for residential floorspace and ancillary residential facilities (Class C3) non-residential floorspace comprising flexible retail (Classes A1 - A4), community (Class D1), leisure (Class D2) and workspace (Class B1) floorspace; provision of basement; new pedestrian and vehicular access; and associated amenity space, open space, plant, landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works; and detailed planning consent for Blocks 7 and 8 comprising residential floorspace and ancillary residential facilities (Class C3); provision of a basement; new pedestrian and vehicular access; and associated amenity space landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works, namely amendments to the approved Masterplan Phasing to incorporate enabling works and piling in Phase 2a and 3a.

    20 Jul 2026 Amendments