Skip to content
PlanIndex Get alerts
Menu

Planning application

3C Motcomb Street London SW1X 8JU

Awaiting decision Westminster 26/03200/LBC Listed Building Consent Application

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Extension of the existing fire escape platform and replacement of the fire escape door. [Linked to 26/03199/FULL]

As published by the council, reference 26/03200/LBC

Application record

Reference
26/03200/LBC
Type
Listed Building Consent Application
Status
Pending
Received
14 May 2026
Validated
14 May 2026
Ward
Knightsbridge & Belgravia
Postcode
SW1X 8JU

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2026.

  • 26/03199/FULL Awaiting decision

    3C Motcomb Street London SW1X 8JU

    Extension of the existing fire escape platform and replacement of the fire escape door. [Linked to 26/03200/LBC]

    Submitted 14 May 2026 Full applications

Timeline

Dates from the published record

  1. 14 May 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Moxey Associates Ltd Agent, registered in Dorchester

Active · incorporated 2019 · Dorchester

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 5A Motcomb Street London SW1X 8JU

    23/04821/TCA Submitted 13 Jul 2023 50 yards away

    T1253 1 x Robinia pseudoacacia (Golden False Acacia) - Prune from adjacent structure to clear building and chimney by 1.5 m, removing regrowth only.

    Granted Trees 6 docs
  • 2 Motcomb Street London SW1X 8JU

    26/07207/TCA Submitted 21 Oct 2026 50 yards away

    100% historically approved · decision due ~16 Dec

    T1, T2 and T3 - Bay Laurel reduce height by approx 2-3m from tips and shorten lateral growth by 1m from tips.

    Awaiting decision Trees
  • 5A Motcomb Street London SW1X 8JU

    26/07134/CLEUD Submitted 16 Oct 2026 50 yards away

    84% historically approved · decision due ~11 Dec

    Confirmation of the planning consent 24/06560/FULL was lawfully implemented within the 3 year time limit period and as such the remainder of the works can be lawfully implemented.

    Awaiting decision Lawful development
  • Flat 3 Carysfort House West Halkin Street London SW1X 8JS

    26/05492/FULL Submitted 12 Aug 2026 50 yards away

    88% historically approved · decision due ~7 Oct

    Replacement of single glazed windows at the ground floor flat front elevation, with slimline double glazed windows in matching style.

    Decided Full applications Windows or glazing
  • Flat 3 Carysfort House West Halkin Street London SW1X 8JS

    26/05493/LBC Submitted 12 Aug 2026 50 yards away

    90% historically approved · decision due ~7 Oct

    Replacement of single glazed windows at the ground floor flat front elevation, with slimline double glazed windows in matching style.

    Decided Heritage and listed buildings Windows or glazing
  • 3C Motcomb Street London SW1X 8JU

    26/03199/FULL Submitted 14 May 2026 50 yards away

    88% historically approved · decision due ~9 Jul

    Extension of the existing fire escape platform and replacement of the fire escape door. [Linked to 26/03200/LBC]

    Awaiting decision Full applications Extension 10 docs

In Westminster

  • 26/07529/LBC Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)

    Received 5 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07509/LBC Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)

    Received 4 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07473/LBC Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)

    Received 3 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07471/LBC Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07461/LBC Awaiting decision

    1 Savile Row London W1S 3JR

    Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings