Skip to content
PlanIndex Get alerts
Menu

Planning application

19 Cork Street London W1S 3NQ

Awaiting decision Westminster 26/03153/LBC Listed Building Consent Application

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Reinstatement of the building following emergency works (controlled demolition), and post-reinstatement CAT A fit-out of the building to provide a high-quality, flexible shell for commercial use (Use Class E). [Linked to 26/03152/FULL]

As published by the council, reference 26/03153/LBC

Application record

Reference
26/03153/LBC
Type
Listed Building Consent Application
Status
Pending
Received
13 May 2026
Validated
13 May 2026
Ward
West End
Postcode
W1S 3NQ

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2026.

  • 26/03152/FULL Awaiting decision

    19 Cork Street London W1S 3NQ

    Reinstatement of the building following emergency works (controlled demolition), and post-reinstatement CAT A fit-out of the building to provide a high-quality, flexible shell for commercial use (Use Class E). [Linked to 26/03153/LBC]

    Submitted 13 May 2026 Full applications

Timeline

Dates from the published record

  1. 13 May 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 66 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Fuller Long Limited Agent

83 applications on PlanIndex · across 23 councils · 80% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 94 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 19 Cork Street London W1S 3NQ

    26/03152/FULL Submitted 13 May 2026 50 yards away

    87% historically approved · decision due ~8 Jul

    Reinstatement of the building following emergency works (controlled demolition), and post-reinstatement CAT A fit-out of the building to provide a high-quality, flexible shell for commercial use (Use Class E). [Linked to 26/03153/LBC]

    Awaiting decision Full applications Demolition 24 docs
  • 5A Burlington Gardens London W1S 3EP

    25/07659/FULL Submitted 22 Oct 2025 50 yards away

    Installation of replacement sliding glazed doors and removal of stall riser.

    Granted Full applications Windows or glazing 19 docs
  • 3 - 5 Burlington Gardens London W1S 3EP

    26/04401/FULL Submitted 2 Jul 2026 50 yards away

    87% historically approved · decision due ~27 Aug

    Shopfront alterations to Unit 2 and new signage to Units 2 and 3

    Decided Full applications Windows or glazing
  • 13 - 14 Cork Street London W1S 3NS

    06/00014/AD7 Submitted 28 Dec 2005 50 yards away

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.9m x 0.6m.

    Granted Advertising 5 docs
  • 13 - 14 Cork Street London W1S 3NS

    05/04875/AD7 Submitted 20 Jun 2005 50 yards away

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.9m x 0.6m.

    Granted Advertising 3 docs
  • 26 Cork Street London W1S 3ND

    26/02167/ADV Submitted 31 Mar 2026 50 yards away

    84% historically approved · decision due ~26 May

    Display of non illiminated art banners on five crossings along Cork Street measuring 3.65m x 1.8m.

    Awaiting decision Advertising 11 docs

In Westminster

  • 26/04878/LBC Decided

    34 Grosvenor Street London W1K 4QU

    Internal works to facilitate the subdivision of 34 Grosvenor Street and 3 Three Kings Yard

    Received 21 Jul, published by the council 1 Aug 2026 Heritage and listed buildings
  • 26/06299/LBC Awaiting decision

    Apartment 33 24 Park Crescent London W1B 1AA

    Alterations to internal partitions, door openings, doors and floor finishes.

    Received 15 Sep, published by the council 22 Sep 2026 Heritage and listed buildings
  • 26/06305/LBC Awaiting decision

    33A Dean Street London W1D 4PP

    Installation of new concrete slab with drainage channels at basement level and new fire surround in B.01.

    Received 15 Sep, published by the council 22 Sep 2026 Heritage and listed buildings
  • 26/06318/LBC Awaiting decision

    124 Hamilton Terrace London NW8 9UT

    Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06317/FULL)

    Received 15 Sep, published by the council 22 Sep 2026 Heritage and listed buildings
  • 26/04141/LBC Decided

    80E Randolph Avenue London W9 1BG

    Replacement of sashes in two front windows at 2nd floor level and one rear window with slimline double glazed timber sashes. (Linked with 26/04142/FULL)

    Received 23 Jun, published by the council 21 Jul 2026 Heritage and listed buildings