Planning application
Development Site At 47-50 Poland Street And 54-57 Great Marlborough Street London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of sample panels of cladding for the Great Marlborough Street façade, Rebuilt Georgian façade at 48 Poland Street (to replicate the existing) and cladding for new poland Street facades pursuant to condition 31 of planning permission dated 12th September 2023 (RN:22/04419/FULL)
As published by the council, reference 26/03004/ADFULL
Application record
- Reference
- 26/03004/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Pending
- Received
- 7 May 2026
- Validated
- 7 May 2026
- Ward
- West End
Site history
Applications at this address on the Westminster register
This site has had 4 applications since 2026.
-
26/03003/ADFULL Awaiting decision
Development Site At 47-50 Poland Street And 54-57 Great Marlborough Street London
Details of typical bays, windows, roof storeys and roof level plant pursuant to condition 30 (1, 2, 5 and 6) of planning permission dated 12th September 2023 (RN:22/04419).
-
26/03002/ADFULL Awaiting decision
Development Site At 47-50 Poland Street And 54-57 Great Marlborough Street London
Detailed samples of the facing materials you will use, including glazing and the cast glass, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 27 of planning permission dated 12th September 2023 (RN:22/04419).
-
26/01366/FULL Awaiting decision
Development Site At 47-50 Poland Street And 54-57 Great Marlborough Street London
Variation of Conditions 1, 13 and 38 of planning permission dated 12 September 2023 (RN: 22/04419/FULL) for, 'Demolition of 54, 55-57 Great Marlborough Street and 47, 48 (behind a part reconstructed facade) and part demolition of 49-50 Poland Street to provide a building comprising ground plus seven storeys with louvred plant room and two basement levels onto Great Marlborough Street (with rear projecting wing at ground and six upper floors with roof level louvred plant room) and a ground plus part five/part six storey building with two basement levels onto Poland Street, all for use as a hotel (Class C1), retail (Class A1), and a restaurant and bar (Class A3/A4). Creation of central glazed covered courtyard and publicly accessible route through the site, a landscaped terrace onto Poland Street, cycle parking, waste storage, plant rooms at fifth, sixth, seventh floors and roof level, services and associated works; namely, to enable design amendments including alterations to the detailed design of the new facades; reconfiguration of the entrances and routes through the ground floor level of the building; the introduction of a mezzanine level at basement level 02 and internal alterations to introduce additional firefighting cores#; NAMELY, to amend the energy strategy, add a fire fighting core, amend the elevation on Great Marlborough Street. relocate substation from the basement to ground floor level, amend the servicing strategy, amend the internal layout to reduce the number of hotel bedrooms and reduction in restaurant and bar space. (Application under Section 73 of the Act).
Timeline
Dates from the published record
-
7 May 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 61 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file
2,030 applications on PlanIndex · across 33 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 85 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Westminster
-
26/06024/FULL Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)
-
26/06017/FULL Awaiting decision
38 Lauderdale Mansions Lauderdale Road London W9 1NE
Installation of an external AC Unit / Heat Pump at roof level.
-
26/05938/FULL Awaiting decision
24 Vincent Square London SW1P 2NJ
Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.
-
26/05935/FULL Awaiting decision
47 Hereford Road London W2 5AH
Installation of one number new external condenser unit to the southerly elevation service alley.
-
26/05959/FULL Awaiting decision
Basement And Ground Floor 50 New Bond Street London W1S 1BJ
Installation of three new condensers on the roof, within an existing designated plant area.