Planning application
67 Gloucester Place London W1U 8JL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Internal alterations.
As published by the council, reference 26/02949/LBC
Application record
- Reference
- 26/02949/LBC
- Type
- Listed Building Consent Application
- Status
- Pending
- Received
- 5 May 2026
- Validated
- 5 May 2026
- Ward
- Marylebone
- Postcode
- W1U 8JL
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2026.
-
26/03925/LBC Awaiting decision
67 Gloucester Place London W1U 8JL
Replacement of sash windows to the property, replacement of awning windows to the rear lightwell, installation of secondary glazing behind casement windows with decorative glazing and replacement of 2no. fire doors. (Linked with 26/03924/FULL)
-
26/03924/FULL Awaiting decision
67 Gloucester Place London W1U 8JL
Replacement of sash windows to the property, replacement of awning windows to the rear lightwell, installation of secondary glazing behind casement windows with decorative glazing and replacement of 2no. fire doors. (Linked with 26/03925/LBC)
Timeline
Dates from the published record
-
5 May 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Frankham Consultancy Group Limited Agent, registered in Sidcup
Active · incorporated 2002 · Sidcup
60 applications on PlanIndex · across 8 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
67 Gloucester Place London W1U 8JL
90% historically approved · decision due ~10 Aug
Replacement of sash windows to the property, replacement of awning windows to the rear lightwell, installation of secondary glazing behind casement windows with decorative glazing and replacement of 2no. fire doors. (Linked with 26/03924/FULL)
Awaiting decision Heritage and listed buildings Windows or glazing 5 docs -
67 Gloucester Place London W1U 8JL
88% historically approved · decision due ~10 Aug
Replacement of sash windows to the property, replacement of awning windows to the rear lightwell, installation of secondary glazing behind casement windows with decorative glazing and replacement of 2no. fire doors. (Linked with 26/03925/LBC)
Awaiting decision Full applications Windows or glazing 5 docs -
48 Gloucester Place Mews London W1U 8BD
89% historically approved · decision due ~8 Oct
Details of amended design of carriage doors to the left-hand ground-floor opening; sash window with sidelights and infill beneath, to the right-hand ground-floor opening; upgrading of the existing front sash windows to accommodate double glazing (and methodology statement); conservation rooflights; and casement windows pursuant to Condition 5 of planning permission dated 24 July 2026 (26/02870/FULL).
Decided Extension Loft or dormer +1 -
48 Gloucester Place Mews London W1U 8BD
88% historically approved · decision due ~25 Jun
Refurbishment and reconfiguration of existing mews dwelling including internal alterations, front elevation alterations, roof alterations, replacement windows and associated works.
Awaiting decision Full applications Roofing Windows or glazing 23 docsDomestic -
71 Gloucester Place London W1U 8JW
Display for a temporary period of six months of a non-illuminated 'to let'/ 'for sale' board attached to the railings in front of the building at street level and measuring 0.6m x 0.45m.
Granted Advertising 3 docs -
71 Gloucester Place London W1U 8JW
Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6 x 0.45m.
Granted Advertising 2 docs
Other heritage and listed building applications
In Westminster
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)
-
26/07461/LBC Awaiting decision
1 Savile Row London W1S 3JR
Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.