Skip to content
PlanIndex Get alerts
Menu

Planning application

26/02799/ADFULL

5A Goldney Road London W9 2AP

Awaiting decision Westminster Approval of Details (Full PP)

Proposal

Details of confirmation that the framing to the new windows at lower ground levels to the front elevation are formed in white painted timber framing (and not in UPVC framing) and approval of elevation and section drawings showing the new windows at scale 1:5 and 1:10 (as appropriate, and including break lines in the drawings if required) including glazing bar details and including the relationship of the windows to the external wall of the building and also any rebates present in the wall surrounding the window openings pursuant to condition 4 and 5 of planning permission dated 16th March 2026 (RN:25/08144/FULL)

As published by the council, reference 26/02799/ADFULL

Timeline

Dates from the published record

  1. 27 Apr 2026

    Received by Westminster

  2. 5 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/06824/TPO Granted

    2 Goldney Road London W9 2AX

    2x lime (T1 and T2): crown reduce to the previous most recent reduction points leaving furnishing growth and at least 50 % of fine internal branch structure.

    23 Sep 2025 35m away Trees
  • 26/04152/TPO Awaiting decision

    16 Goldney Road London W9 2AX

    T1 Lime, remove trunk growth and tidy up basal growth as it is affecting the pavement, "trunk clean" by removing epicormic shoots up to 4m.

    23 Jun 2026 40m away Trees
  • 26/01829/FULL Awaiting decision

    Flat 3 4 Edbrooke Road London W9 2DF

    Erection of a mansard roof extension at third floor level and associated works.

    20 Mar 2026 63m away Full applications
  • 26/02522/FULL Awaiting decision

    Basement And Ground Floor 6 Marylands Road London W9 2DZ

    Installation of external perforated security roller shutters to the shopfront glazing and entrance door of the existing ground floor commercial unit.

    16 Apr 2026 66m away Full applications
  • 26/00820/FULL Awaiting decision

    39A Marylands Road London W9 2DU

    Erection of a single-storey rear extension to lower ground floor flat.

    11 Feb 2026 66m away Full applications
  • 25/06584/TPO Awaiting decision

    30 Marylands Road London W9 2DX

    T1 (1 x Lime): crown reduction by about 2.5m and crown thinning; to suitable secondary growth points and no more than previous most recent points of reduction, and retaining at least 50% of fine branch structure; providing a naturally flowing canopy outline; retaining shortened furnishing growth for crown continuity; to prevent branch contact with building and allowing more light into surrounding windows and front garden. Removal of basal and epicormic growth from main stem up to 6m in height; to reduce and prevent obstruction to footpath and provide sufficient clearance to property, and allowing more light into surrounding windows and front garden. T2 (1 x Lime): crown reduction by about 2.5m and crown thinning; to suitable secondary growth points and no more than previous most recent points of reduction, and retaining at least 50% of fine branch structure; providing a naturally flowing canopy outline; retaining shortened furnishing growth for crown continuity; to prevent branch contact with building and allowing more light into surrounding windows and front garden. Removal of basal and epicormic growth from main stem up to 6m in height; to reduce and prevent obstruction to footpath and provide sufficient clearance to property, and allowing more light into surrounding windows and front garden.

    15 Sep 2025 83m away Trees

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications