Skip to content
PlanIndex Get alerts
Menu

Planning application

53 Romney Street London SW1P 3RF

Awaiting decision Westminster 26/02774/FULL Full Planning Permission Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Adjust entrance threshold to improve disabled access

As published by the council, reference 26/02774/FULL

Application record

Reference
26/02774/FULL
Type
Full Planning Permission Application
Status
Pending
Received
27 Apr 2026
Validated
27 Apr 2026
Ward
St James's
Postcode
SW1P 3RF

Timeline

Dates from the published record

  1. 27 Apr 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 22 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 66 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Andrew Stone Architect Ltd. Agent, an architecture practice registered in Dorchester

Active · incorporated 2006 · Dorchester

5 applications on PlanIndex · across 4 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 91 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 62 - 64 Horseferry Road London SW1P 2AF

    25/04703/LBC Submitted 8 Jul 2025 50 yards away

    Replacement entrance doors, new door intercom and CCTV systems, replacement of an existing window at rear ground floor with a louvred ventilation panel, installation of a pergola in lower ground floor rear lightwell and new rooftop plant; new external signage including two flagpole signs and two embassy shields and information plaques at each entrance; and, internal alterations including installation of secondary glazing and internal roller security shutters, creation of a lift shaft, and alterations to the internal layouts.

    Granted Heritage and listed buildings Windows or glazing 22 docs
  • 62 - 64 Horseferry Road London SW1P 2AF

    25/04702/FULL Submitted 8 Jul 2025 50 yards away

    Replacement entrance doors, new door intercom and CCTV systems, replacement of an existing window at rear ground floor with a louvred ventilation panel, installation of a pergola in lower ground floor rear lightwell and new rooftop plant.

    Granted Full applications Windows or glazing 29 docs
  • 62 - 64 Horseferry Road London SW1P 2AF

    25/04701/ADV Submitted 8 Jul 2025 50 yards away

    Display of: Finnish and European Union flags at first floor level on Horseferry Road elevation, each measuring 1.96 m x1.20 m; two non-illuminated brass plate signs, one at each entrance measuring 0.29 m x 0.21 m; and, two Embassy sheilds, one each above the entrance doors on Horseferry Road and Tufton Street. (Linked to RN 25/04703/LBC)

    Granted Advertising 9 docs
  • 62 - 64 Horseferry Road London SW1P 2AF

    26/03173/ADFULL Submitted 14 May 2026 50 yards away

    87% historically approved · decision due ~9 Jul

    Details of secure cycle storage and waste; pursuant to condition 2 and 3 of planning permission dated 29 May 2025 (RN 25/01227/FULL)

    Awaiting decision Full applications 5 docs
  • 62 - 64 Horseferry Road London SW1P 2AF

    25/08503/ADFULL Submitted 20 Nov 2025 50 yards away

    Details of intercom fixings and CCTV pursuant to condition 4 of planning permission dated 03 October 2025 (RN: 25/04702/FULL).

    Granted Full applications 8 docs
  • 62 - 64 Horseferry Road London SW1P 2AF

    26/01188/ADFULL Submitted 25 Feb 2026 50 yards away

    Details of the fire emergency system and the associated controls for the fire exit only door pursuant to Condition 8 of planning permission dated 3 October 2025 (RN: 25/04702/FULL)

    Granted Full applications 11 docs

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06317/FULL Awaiting decision

    124 Hamilton Terrace London NW8 9UT

    Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications