Planning application
26/02357/FULL
37 Charlbert Street London NW8 7BP
Proposal
Infilling of rear courtyards at ground floor level; incorporation of first floor retail area into existing residential flat; creation of a terrace at first floor level; creation of a glazed door and terrace at second floor level; replacement single glazed windows to double glazed; installation of green roof; and replacement of shopfront. (Site includes 37 - 39)
As published by the council, reference 26/02357/FULL
Timeline
Dates from the published record
-
10 Apr 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/02355/FULL Awaiting decision
37 Charlbert Street London NW8 7BP
Infilling of rear courtyards at ground floor level; incorporation of first floor retail area into existing residential flat; creation of a terrace at first floor level; replacement single glazed windows to double glazed; installation of green roofs; installation of rooflight; installation of air source heat pumps; installation of PV panels to rear roof slope and replacement of shopfront. (Site includes 37 - 39)
-
26/02792/ADFULL Awaiting decision
10 Charlbert Street London NW8 7BP
Sample of Opaque glass, including details of Solar panels incorporated to the flat roof including their projection; pursuant to condition 4 and 6 of planning permission dated 4th July 2025 (RN 25/02612/FULL)
-
26/03015/FULL Awaiting decision
10 Charlbert Street London NW8 7BP
Variation of condition 1 of planning permission dated 4th July 2025 (RN 25/02612/FULL) for the replacement of existing loft dormer with an enlarged dormer extension; replacement of existing ground floor extension roof with a flat roof & a sliding door within the existing opening; installation of new conservation rooflights to the front elevation; a new small side window to the first floor; and replacement of rear first floor windows. NAMELY, to vary the plans to allow for an increase in the parapet height.
-
25/05752/FULL Refused
Flat 11 Bentinck Close 76 - 82 Prince Albert Road London NW8 7RY
Lowering of 5th floor windows, to create doors to access balcony (facing Prince Albert Road).
-
25/06014/LBC Granted
Oslo Court Prince Albert Road London NW8 7EN
Renewing of the electrical supply in the building, including within communal corridors and supply to 129 flats, including construction of dropped ceilings, and boxing works, additional and upgraded lighting, and the provision of a fire alarm system.
-
05/00104/FULL Granted
75 Charlbert Court Charlbert Street London NW8 7DB
Replacement of metal windows to front and rear elevations with white powder coated aluminium double glazed windows, and metal door to rear elevation with white powder coated aluminium double glazed door, to Flats 75, 77, 79, 89 and 94.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.