Skip to content
PlanIndex Get alerts
Menu

Planning application

26/02320/FULL

Penthouse 95 Eaton Square London SW1W 9AQ

Awaiting decision Westminster Full Planning Permission Application

Proposal

Variation of condition 1 of planning permission dated 16 April 2025 (RN: 24/06846/FULL) for 'External works including installation of replacement double glazed metal windows to front and rear elevations, creation of enlarged balcony to principal reception room. alterations to metal railings, new rooflight and replace roof hatches at main roof level, installation of sliding box lantern for access to existing roof terrace and installation of PV panels at roof level'. Namely, the change in glazing specification from the consented double glazing to proposed triple glazing windows, consented ratio of solids to voids to remain as previously agreed and consented. (Linked to 26/02321/LBC)

As published by the council, reference 26/02320/FULL

Timeline

Dates from the published record

  1. 8 Apr 2026

    Received by Westminster

  2. 27 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/03592/LBC Awaiting decision

    95 Eaton Square London SW1W 9AQ

    Replacement of windows and doors at 95J & 95H Eaton Square. (Linked with 26/03591/FULL)

    2 Jun 2026 0m away Heritage and listed buildings
  • 26/02321/LBC Awaiting decision

    Penthouse 95 Eaton Square London SW1W 9AQ

    Minor specification alterations to the approved fenestration on the front elevation including the change in glazing specification from the consented double glazing to proposed triple glazing windows, consented ratio of solids to voids to remain as previously agreed and consented.

    8 Apr 2026 0m away Heritage and listed buildings
  • 26/03591/FULL Awaiting decision

    95 Eaton Square London SW1W 9AQ

    Replacement of windows and doors at 95J & 95H Eaton Square. (Linked with 26/03592/LBC)

    2 Jun 2026 9m away Full applications
  • 26/02663/LBC Awaiting decision

    Flat R 95 Eaton Square London SW1W 9AQ

    Internal alterations including finishes and joinery; replacement kitchen; reconfiguration of ensuite bathroom; removal and replacement of non-structural partitions and bathroom finishes.

    22 Apr 2026 10m away Heritage and listed buildings
  • 26/02029/LBC Awaiting decision

    Penthouse 95 Eaton Square London SW1W 9AQ

    Relocation of two internal gas meters to balcony; Installation of one new painted cast iron airbrick to provide adequate ventilation to a laundry utility room; Replacement of two non-operational chimney pots with two chimney pots with concealed flue fans and other associated works. Linked with 26/02028/FULL

    26 Mar 2026 29m away Heritage and listed buildings
  • 26/02028/FULL Awaiting decision

    Penthouse 95 Eaton Square London SW1W 9AQ

    Variation of condition 1 of planning permission dated 16th April 2025 (RN:24/06846/FULL) for the External works including installation of replacement double glazed metal windows to front and rear elevations, creation of enlarged balcony to principal reception room. alterations to metal railings, new rooflight and replace roof hatches at main roof level, installation of sliding box lantern for access to existing roof terrace and installation of PV panels at roof level. NAMELY, to allow minor required alterations, to inlcude, relocating two internal gas meters to balcony locations externally, installation of one new painted cast iron airbrick on secondary rear facade to provide adequate ventilation to a laundry utility room, replacement of two non-operational chimney pots with two chimney pots with concealed flue fans, exchange of approved drawings referenced by Condition 1. Linked with 26/02029/LBC

    26 Mar 2026 29m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications