Planning application
26/02285/ADFULL
30 Sackville Street London W1S 3DY
Proposal
Detailed drawings and a bio-diversity management plan in relation to the green screen pursuant to condition 7 of planning permission dated 6th October 2025 (RN: 25/05589/FULL).
As published by the council, reference 26/02285/ADFULL
Timeline
Dates from the published record
-
7 Apr 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01287/ADLBC Awaiting decision
30 Sackville Street London W1S 3DY
Details of internal staircase pursuant to Condition 3 of listed building consent dated 17 February 2025 (RN: 25/01073/LBC)
-
26/02571/ADLBC Awaiting decision
30 Sackville Street London W1S 3DY
Details of a plan marked up with removals in red and cross-referenced to a photographic survey showing any existing doors and architraves you wish to remove at ground and first floor levels, and plan/elevation/section/example photograph (as appropriate) of any new architraves and doors to be installed at ground and first floor levels pursuant to condition 5 of listed building consent dated 28th May 2025 (RN:25/01073).
-
26/02282/ADFULL Awaiting decision
30 Sackville Street London W1S 3DY
Details of landscaping plan including detailed drawings and a biodiversity management plan in relation to the green roof above the new rear ground floor extension pursuant to condition 20 of planning permission dated 17th February 2025 (RN: 25/01072/FULL).
-
25/05590/LBC Granted
30 Sackville Street London W1S 3DY
Removal of existing third floor plant enclosure and five air conditioning units on the roof and installation of one air conditioning unit on the roof and 'green screen' to the existing terrace at third floor level. (Linked to 25/05589/FULL)
-
25/05589/FULL Granted
30 Sackville Street London W1S 3DY
Removal of existing third floor plant enclosure and five air conditioning units on the roof and installation of one air conditioning unit on the roof and 'green screen' to the existing terrace at third floor level. (Linked to 25/05590/LBC)
-
25/06078/LBC Granted
30 Sackville Street London W1S 3DY
Demolition of the roof and its reconstruction to the same external profile and finished appearance, with retained historic timbers and new structural timbers.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.