Planning application
26/02273/FULL
Grand Buildings Trafalgar Square London WC2N 5EJ
Proposal
Erection of rooftop pavilion and glass balustrade to facilitate the use of part of the flat roof as an external amenity area for occupiers of the building; relocation of photovoltaic panels.
As published by the council, reference 26/02273/FULL
Timeline
Dates from the published record
-
7 Apr 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/06177/CLEUD Granted
Grand Buildings Trafalgar Square London WC2N 5EJ
Use of a flat located on Level 7 and 8 at One Strand as Office floorspace (Class E).
-
26/04991/ADFULL Awaiting decision
Grand Buildings 1 - 3 Strand London WC2N 5HE
Details of the works to create the residential accommodation within Tower 3 have taken place and the residential floorspace is ready for occupation; pursuant to condition 3(i) of planning permission dated 20th April 2026 (26/01434/FULL)
-
26/00480/NMA Granted
Grand Buildings 1 - 3 Strand London WC2N 5HE
Amendments to planning permission dated 10th December 2024 (RN: 24/07337/FULL) for: installation of photovoltaic panels at roof level namely, relocation and installation of photovoltaic panels and installation of metal grilles over sunken plant areas.
-
26/01434/FULL Awaiting decision
Grand Buildings 1 - 3 Strand London WC2N 5HE
Use of Tower 03 at 7th and 8th floor level as a residential maisonette (Class C3) and use of Tower 04 at 7th and 8th floor level as offices (Class E).
-
26/01969/ADFULL Awaiting decision
5 Strand London WC2N 5HR
Details of Code of Construction Practice pursuant to Condition 3 of planning permission dated 24/09/2024 (RN: 23/05178/FULL)
-
25/08410/ADFULL Awaiting decision
11 Strand London WC2N 5HR
Details of premises management plan, the acoustic housing detail plan and servicing managment plan pursuant to conditions 3,4 and 5 of planning permission dated 11th April 2024 (RN:23/02207/FULL)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.