Planning application
26/02014/FULL
3 Savile Row London W1S 3PB
Proposal
Internal and external alterations associated with the refurbishment and extension of the building, including the installation of a new firefighting lift within the modern rear wing, and the demolition of the existing roof-level plant rooms and erection of a new set-back storey with terrace and plant enclosures at roof level. (Linked to 26/02015/LBC)
As published by the council, reference 26/02014/FULL
Timeline
Dates from the published record
-
26 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/03087/FULL Awaiting decision
3 Savile Row London W1S 3PB
Change of use of the building to a flexible use for either continued use Class E commercial, business and service use, or for sui generis cultural experience and exhibition use, with associated retail space and cafe/bar.
-
26/02015/LBC Awaiting decision
3 Savile Row London W1S 3PB
Internal and external alterations associated with the refurbishment and extension of the building, including the installation of a new firefighting lift within the modern rear wing, and the demolition of the existing roof-level plant rooms and erection of a new set-back storey with terrace and plant enclosures at roof level. (Linked to 26/02014/FULL)
-
25/08180/LBC Awaiting decision
1 Savile Row London W1S 3JR
Internal alterations
-
26/02140/LBC Awaiting decision
1 Savile Row London W1S 3JR
Internal alterations including installation of a brass picture rail; replacement entrance flooring details; and other associated works.
-
25/05782/LBC Granted
7 Vigo Street London W1S 3HF
Fit out of second and fourth floors including refurbishment of common areas.
-
26/02247/CLOPUD Awaiting decision
Vigo House 115 Regent Street London W1B 4HW
Use of part of the ground floor as a café ancillary to the store.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.