Skip to content
PlanIndex Get alerts
Menu

Planning application

129 New Bond Street London W1S 1EA

Awaiting decision Westminster 26/01933/FULL Full Planning Permission Application

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

The erection of a roof extension and associated roof terrace, new plant equipment, external alterations to the facade including; new doors, signage, lighting, a new flag and associated works.

As published by the council, reference 26/01933/FULL

Application record

Reference
26/01933/FULL
Type
Full Planning Permission Application
Status
Pending
Received
25 Mar 2026
Validated
25 Mar 2026
Ward
West End
Postcode
W1S 1EA

Site history

Applications at this address on the Westminster register

This site has had 7 applications since 2025: 1 approved, 0 refused.

  • 26/07045/ADFULL Decided

    129 New Bond Street London W1S 1EA

    Samples of the facing materials pursuant to condition 4 (part) of planning permission dated 6th September 2024 (24/01613/FULL)

    Submitted 15 Oct 2026
  • 26/06673/FULL Awaiting decision

    129 New Bond Street London W1S 1EA

    Variation of condition 1 of planning permission dated 23rd June 2026 (RN:26/01933/FULL) for the The erection of a roof extension and associated roof terrace, new plant equipment, external alterations to the facade including; new doors, signage, lighting, a new flag and associated works. Namely, installation of air conditioning grilles on the rear elevation, changes to the main entrance door design and detailing; and installation of CCTV cameras.

    Submitted 29 Sep 2026 Full applications
  • 26/01934/ADV Awaiting decision

    129 New Bond Street London W1S 1EA

    Display of non illuminated fascia sign measuring 5.4m X 0.31m, non illuminated other sign measuring 1.58m X 2.27m and 0.185m X 0.215m

    Submitted 25 Mar 2026 Advertising
  • 26/00793/ADFULL Awaiting decision

    129 New Bond Street London W1S 1EA

    Detailed drawings of the windows pursuant to condition 3 (1) of planning permission dated 6 September 2024 (RN: 24/01613/FULL).

    Submitted 10 Feb 2026 Full applications
  • 26/00357/ADV Awaiting decision

    129 New Bond Street London W1S 1EA

    Display of four non-illuminated advertisements on temporary hoarding fronting New Bond Street and five non-illuminated advertisements fronting Grosvenor Street.

    Submitted 22 Jan 2026 Advertising
  • 25/06805/ADFULL Granted

    129 New Bond Street London W1S 1EA

    Details of windows, doors and samples of the facing materials you will use, including glazing, louvres, brickwork, and elevations and roof plans annotated to show where the materials are to be located pursuant to conditions 3 (1 and 2) and 4 of planning permission dated 6th September 2024 (RN:24/01613).

    Decided 7 Oct 2025 Full applications

Timeline

Dates from the published record

  1. 25 Mar 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 20 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 26/06673/FULL Awaiting decision

    129 New Bond Street London W1S 1EA

    Variation of condition 1 of planning permission dated 23rd June 2026 (RN:26/01933/FULL) for the The erection of a roof extension and associated roof terrace, new plant equipment, external alterations to the facade including; new doors, signage, lighting, a new flag and associated works. Namely, installation of air conditioning grilles on the rear elevation, changes to the main entrance door design and detailing; and installation of CCTV cameras.

    Submitted 29 Sep 2026 Full applications

Who's behind it

Company information only, from the register and Companies House

Newmark LLP Agent

925 applications on PlanIndex · across 40 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

33 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 129 New Bond Street London W1S 1EA

    26/01934/ADV Submitted 25 Mar 2026 50 yards away

    82% historically approved · decision due ~20 May

    Display of non illuminated fascia sign measuring 5.4m X 0.31m, non illuminated other sign measuring 1.58m X 2.27m and 0.185m X 0.215m

    Awaiting decision Advertising 33 docs
  • 129 New Bond Street London W1S 1EA

    26/00793/ADFULL Submitted 10 Feb 2026 50 yards away

    88% historically approved · decision due ~7 Apr

    Detailed drawings of the windows pursuant to condition 3 (1) of planning permission dated 6 September 2024 (RN: 24/01613/FULL).

    Awaiting decision Full applications Windows or glazing 4 docs
  • 129 New Bond Street London W1S 1EA

    25/06805/ADFULL Submitted 22 Sep 2025 50 yards away

    Details of windows, doors and samples of the facing materials you will use, including glazing, louvres, brickwork, and elevations and roof plans annotated to show where the materials are to be located pursuant to conditions 3 (1 and 2) and 4 of planning permission dated 6th September 2024 (RN:24/01613).

    Granted Full applications Windows or glazing 23 docs
  • 129 New Bond Street London W1S 1EA

    26/00357/ADV Submitted 22 Jan 2026 50 yards away

    82% historically approved · decision due ~19 Mar

    Display of four non-illuminated advertisements on temporary hoarding fronting New Bond Street and five non-illuminated advertisements fronting Grosvenor Street.

    Awaiting decision Advertising 1 doc
  • 129 New Bond Street London W1S 1EA

    26/07045/ADFULL Submitted 15 Oct 2026 50 yards away

    89% historically approved · decision due ~11 Dec

    Samples of the facing materials pursuant to condition 4 (part) of planning permission dated 6th September 2024 (24/01613/FULL)

    Decided
  • 129 New Bond Street London W1S 1EA

    26/06673/FULL Submitted 29 Sep 2026 50 yards away

    88% historically approved · decision due ~24 Nov

    Variation of condition 1 of planning permission dated 23rd June 2026 (RN:26/01933/FULL) for the The erection of a roof extension and associated roof terrace, new plant equipment, external alterations to the facade including; new doors, signage, lighting, a new flag and associated works. Namely, installation of air conditioning grilles on the rear elevation, changes to the main entrance door design and detailing; and installation of CCTV cameras.

    Awaiting decision Full applications Extension

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications