Planning application

26/01858/FULL

28 Chester Row London SW1W 9JB

Awaiting decision Westminster Full Planning Permission Application

Proposal

Installation of staircase within front lightwell and gate within existing railings; replacement of front lightwell paving; replacement of existing lantern lights in roof of existing single storey rear extension with two rooflights; demolition and replacement of existing roof extension with new mansard roof extension; installation of air conditioning condenser unit within acoustic enclosure at front second-floor level; replacement of front entrance door and fanlight; replacement of door to Minera Mews; replacement French doors to front basement lightwell and replacement of all single-glazed timber sash windows with double-glazed timber sash windows.

As published by the council, reference 26/01858/FULL

Timeline

Dates from the published record

  1. 23 Mar 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/05233/FULL Granted

    53 Eaton Terrace London SW1W 8TR

    Retention of air conditioning unit to roof.

    28 Jul 2025 32m away Full applications
  • 25/05216/LBC Granted

    53 Eaton Terrace London SW1W 8TR

    Retention of air conditioning unit on roof.

    25 Jul 2025 32m away Heritage and listed buildings
  • 26/04284/FULL Awaiting decision

    35 - 35A Chester Row London SW1W 9JE

    Variation of condition 1 of planning permission dated 7th June 2022 (RN:21/08587/FULL) for the Amalgamation of 35 & 35A to form a single dwellinghouse, erection of infill extensions at lower ground floor and ground floor level with associated terrace to rear; demolition and rebuild of extended main closet wing at ground, first and second floor levels; Demolition and rebuild of long closet wing extension with additional storey; Erection of plant enclosure and shed to rear garden; Excavation to create basement; Alterations to fenestration and doors; and associated external alterations. Namely, changes to the rear extension to accommodate a double height garden room space

    29 Jun 2026 32m away Full applications
  • 26/04283/FULL Awaiting decision

    35 Chester Row London SW1W 9JE

    Alterations to existing boundary wall between 33 and 35 Chester Row to raise the wall height.

    29 Jun 2026 35m away Full applications
  • 26/00876/LBC Awaiting decision

    1 South Eaton Place London SW1W 9ES

    Alterations at basement level, including reconfiguration of existing modern partitions and the upgrading and incorporation of the front pavement vaults into the basement accommodation through floor lowering and internal connection, internal alterations at ground floor level, including a new opening between existing rooms and alterations to the rear outshot at first floor level to provide access to an existing roof area and replacement of modern glazed roof structures [Linked to 26/00989/FULL]

    12 Feb 2026 49m away Heritage and listed buildings
  • 26/00220/ADFULL Refused

    79 Eaton Terrace London SW1W 8TN

    Sample panel of brickwork, built on site, which shows the colour, texture, face bond and pointing pursuant to condition 4 of planning permission dated 8th April 2025 (RN 24/08694/FULL)

    15 Jan 2026 50m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications