Planning application
Southbank Centre Belvedere Road Lambeth SE1 8XX
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection and installation of a temporary staircase and installations for the Southbank Centre's 75th Anniversary within the Southbank Centre complex
As published by the council, reference 26/01777/OBS
Application record
- Reference
- 26/01777/OBS
- Type
- Application for obs to adj boroughs
- Status
- Pending
- Received
- 18 Mar 2026
- Validated
- 18 Mar 2026
- Postcode
- SE1 8XX
Timeline
Dates from the published record
-
18 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 66 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Lambeth Planning Agent, a planning consultancy
10 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster's median decision took 66 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Westminster's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Royal Festival Hall, Unit 8 South Bank London Lambeth SE1 8XX
62% historically approved · decision due ~29 Sep
Installation of signage relating to Unit 8 at the Southbank Centre.
Awaiting decision Advertising 7 docs -
The Southbank Centre Belvedere Road London SE1 8XX
74% historically approved · decision due ~14 Jul
Temporary opening in the existing floor slab of the Hayward Gallery to facilitate the installation and display of sculpture as part of a temporary exhibition.
Decided Heritage and listed buildings 6 docs -
Unit 14 Royal Festival Hall South Bank London SE1 8XX
Installation of a glazed veranda enclosure over the existing restaurant terrace seating area with retractable roof and associated works.
Granted Full applications Windows or glazing 14 docs -
Royal Festival Hall South Bank London SE1 8XX
83% historically approved · decision due ~14 Jul
Application for a non-material amendment following a grant of planning permission 25/04001/NMC (Demolition/replacement of existing extension, and reconfiguration of unit 8 including change of use of storage area to Use Class E, together with enclosing the remaining space beneath the railway arches with slimline metal framed glazed screen with pivot doors, new slatted timber and metal facade to service wall, the replacement of doors to the side of the elevation with glazed bi-folding doors , and the relocation of the entrance doors, plus the creation of an outdoor seating area with associated public realm works.) Granted on 23.03.2026 Amendment Sought: Material finish and door specification
Decided Extension Demolition +1 14 docs -
The Southbank Centre Belvedere Road London SE1 8XX
74% historically approved · decision due ~4 May
Erection and installation of a temporary staircase and installations for the Southbank Centre's 75th Anniversary within the Southbank Centre complex
Decided Heritage and listed buildings 35 docs -
The Southbank Centre Belvedere Road London SE1 8XX
83% historically approved · decision due ~12 Oct
Approval of details pursuant to condition 18 (schedule of the proposed structures and associated equipment) of planning permission 24/01894/FUL (Erection and installation of temporary structures and artworks for up to 20 Winter and Summer Programmes in connection with the Southbank Centre), granted on 04.10.2024.
Awaiting decision 2 docs