Planning application
26/01767/FULL
Hotel 30 - 52 Rathbone Street London W1T 1LB
Proposal
External alterations to the facade of the Rathbone Hotel including refurbishment of first-floor window surrounds.
As published by the council, reference 26/01767/FULL
Timeline
Dates from the published record
-
18 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01768/ADV Awaiting decision
Hotel 30 - 52 Rathbone Street London W1T 1LB
Display of externally illuminated fascia sign stain steel lettering measuring 200mm x 2100mm.
-
26/03825/NMA Awaiting decision
Hotel 30 - 52 Rathbone Street London W1T 1LB
Amendments to planing permission dated 11 May 2026 (RN: 26/01767/FULL) for the: External alterations to the facade of the Rathbone Hotel including replacement of first-floor windows and associated works. NAMELY, to allow the submission of revision to the approved first-floor front elevation window design.
-
2011/5608/A Granted
49-51 Rathbone Street London W1T1NP
Display of 3 non-illuminated 'Jigsaw' logo signs to existing ground floor fascia on Rathbone Street and Charlotte Place.
-
2011/5607/A Granted
49-51 Rathbone Street London W1T1NP
Display of 3 non-illuminated 'Kew.159' logo signs to existing ground floor fascias on Rathbone Street and Charlotte Place.
-
2016/3892/A Granted
33 Charlotte Street (formerly known as 53 Rathbone Street) London W1T 1RR
Display of 1 x internally illuminated fascia sign, 1 internally illuminated menu sign and 1 internally illuminated logo plaque
-
2019/0907/A Granted
33-37 Charlotte Street London W1T 1RR
Display of 1x internally illuminated lettering projecting sign to Charlotte Street elevation.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.