Planning application
Rangers Cottage Hyde Park Serpentine Road London W2 2UH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of two air-source heat pumps on roof. (Linked with 26/01762/LBC)
As published by the council, reference 26/01761/FULL
Application record
- Reference
- 26/01761/FULL
- Type
- Full Planning Permission Application
- Status
- Pending
- Received
- 18 Mar 2026
- Validated
- 24 Mar 2026
- Ward
- Hyde Park
- Postcode
- W2 2UH
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2026.
-
26/01762/LBC Awaiting decision
Rangers Cottage Hyde Park Serpentine Road London W2 2UH
Installation of 2 small air-source heat pumps to non-original roof and 9 internal fan coil units to existing ceiling and wall voids. (Linked with 26/01761/FULL)
Timeline
Dates from the published record
-
18 Mar 2026
Received by Westminster
-
24 Mar 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Nicholas Zervoglos Architects Ltd Agent, an architecture practice registered in London
Active · incorporated 2018 · London
3 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Victoria Gate Lodge Hyde Park Bayswater Road London W2 2UH
88% historically approved · decision due ~9 Jun
Details of Composite Works Licence relating to the re-erection of the Lord Byron Statue in Hyde Park pursuant to condition 2 of planning permission dated 18th June 2024 (RN: 23/08641/FULL). Linked to 26/02413/ADLBC
Awaiting decision Full applications 6 docs -
Victoria Gate Lodge Hyde Park Bayswater Road London W2 2UH
89% historically approved · decision due ~8 Jun
Details of Composite Works Licence relating to the re-erection of the Lord Byron Statue in Hyde Park pursuant to condition 2 of listed building consent dated 18th June 2024 (RN:23/08642/LBC). Linked to 26/02427/ADFULL
Awaiting decision Conditions 6 docs -
Rangers Cottage Hyde Park Serpentine Road London W2 2UH
90% historically approved · decision due ~19 May
Installation of 2 small air-source heat pumps to non-original roof and 9 internal fan coil units to existing ceiling and wall voids. (Linked with 26/01761/FULL)
Awaiting decision Heritage and listed buildings 9 docs -
Kensington Gardens Serpentine Road London W2 2UH
89% historically approved · decision due ~20 Nov
Details of written and photographic schedules, samples and trial panels of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 4 of planning permission dated 28th May 2026 (RN:26/00173/FULL)
Decided Windows or glazing -
Hyde Park Serpentine Road London W2 2UH
89% historically approved · decision due ~23 Nov
Details of an Arboricultural Assessment to be submitted within three months of the completion of the 2026 event setting out whether any remediation measures have been undertaken or are required to protect the trees following the event pursuant to Condition 8 of planning permission dated 4 June 2026 (25/09350/FULL).
Awaiting decision Trees -
Kensington Gardens Serpentine Road London W2 2UH
88% historically approved · decision due ~10 Mar
Erection of a new permanent single storey building within the Kensington Gardens store yard to provide accommodation for the Landscape Maintenance (LM) Contractor as well as renovate the existing Park office.
Awaiting decision Full applications 53 docsSmall domestic
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)