Planning application
26/01611/FULL
Basement And Ground Floor 28 James Street Marylebone High Street London W1U 1EW
Proposal
Removal of an existing timber frame bi-fold window and installation of a timber frame sash window to the shop front.
As published by the council, reference 26/01611/FULL
Timeline
Dates from the published record
-
11 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/08119/FULL Awaiting decision
Barrett Street Public Convenience Outside 21 Barrett Street London W1U 1AX
Use of the Barrett Street Public Conveniences as a cafe or retail unit (both Class E).
-
25/05786/FULL Awaiting decision
Barrett Street Public Convenience Outside 21 Barrett Street London W1U 1AX
Removal of the Barrett Street fountain and replacement with paving stones to match surrounding piazza.
-
26/00843/FULL Awaiting decision
29A James Street Marylebone High Street London W1U 1DZ
Replacement shopfront with metal crittal openable shopfront (to both elevations) including oak cladding, corrugated metal sheet for fascia, perforated metal sheet to railing and gate, replacement of existing heaters with new.
-
03/05159/ADV Granted
Christmas Decorations St Christopher's Place London W1U 1NZ
Display of Christmas decorations from 15 November 2003 to 6 January 2004.
-
04/07508/ADV Granted
Christmas Decorations St Christopher's Place London W1U 1NZ
Display of Christmas decorations along St Christopher's Place, Barrett Street, James Street and Gees Court for a temporary period between November 04 and January 05.
-
06/07148/LBC Granted
28 - 32 St Christopher's Place London W1U 1NZ
Installation of non illuminated letters at fascia level.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.