Planning application
26/01594/FULL
55 Moreton Street London SW1V 2NY
Proposal
Erection of a mansard roof to Nos. 55, 57 and 59 Moreton Street to create 3 x 1 bedroom flats (site includes Nos. 57 and 59).
As published by the council, reference 26/01594/FULL
Timeline
Dates from the published record
-
11 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/05784/TCA Granted
16 Lupus Street London SW1V 3DZ
1 x bay (T1, rear): Reduce the height by 2.5m, reduce the lateral growth by 1-2m.
-
25/05776/TCA Granted
20 Lupus Street London SW1V 3DZ
1 x lime: (T1, rear): Reduce the height by 2.5m, reduce the lateral growth by 1-1.5m leaving furnishing growth, reducing the side of the canopy over no.18's garden slightly harder, whilst retaining greenery and blending the edge of the canopy.
-
25/05777/TCA Granted
12 Lupus Street London SW1V 3DZ
1 x lime (T2, rear): Crown reduction; reducing the height by 3m back to previous reduction points, reduce the lateral growth by 2-2.5m back to previous reduction points, leaving shortened furnishing growth, thin internally by 15%.
-
25/07756/FULL Awaiting decision
12A St George's Square London SW1V 2HP
Replacement of existing rear door leading onto garden. (Linked with 25/07757/LBC)
-
25/07757/LBC Awaiting decision
12A St George's Square London SW1V 2HP
Replacement of existing rear door leading onto garden. (Linked with 25/07756/FULL)
-
26/00301/FULL Granted
Flat G 128 Belgrave Road London SW1V 2BL
Replacement of the existing rear windows to top floor mansard with new timber framed french doors.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.