Planning application
26/01487/FULL
Almack House 28 King Street St James's London SW1Y 6QW
Proposal
Installation of a mechanical plant at lower ground floor and installation of two grilles to two lower ground floor windows
As published by the council, reference 26/01487/FULL
Timeline
Dates from the published record
-
9 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/06104/CLEUD Granted
5 - 7 King Street St James's London SW1Y 6QS
Fifth floor (top floor) used as ClassE (g)(i) offices including meeting rooms, kitchens and toilet facilities.
-
26/02827/CLLB Awaiting decision
20 Crown Passage London SW1Y 6PP
Air conditioning condenser unit on the back wall of the property, at intermediate 2nd- 3rd floor level. 3 air conditioning condenser units provide the heating system for the upper 3 floors of the property. They are partially or fully hidden from the view of the properties opposite. 2 units have been present for more than 10 years, the 3rd unit for more than 4 years.
-
26/01245/FULL Granted
20 Crown Passage London SW1Y 6PP
Installation of two air conditioning units to rear elevation. Installation air vent cover at ground floor level to Crown Passage side elevation.
-
25/05973/COLBC Awaiting decision
1 Pickering Place London SW1A 1EA
Installation of original gas lantern (1 - 4 Pickering Place)
-
26/01828/LBC Awaiting decision
20 St James's Square London SW1Y 4JH
Removal of existing light fittings and replacement with new contemporary light fittings at the ground, first, second and third floors with associated works.
-
26/00902/FULL Awaiting decision
69 Pall Mall London SW1Y 5EY
Replacement of principle entrance doors.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.