Skip to content
PlanIndex Get alerts
Menu

Planning application

26/01444/FULL

12 Orme Square London W2 4RS

Awaiting decision Westminster Full Planning Permission Application

Proposal

Variation of Condition 1 of planning permission dated 5 January 2024 (RN: 23/02189/FULL) for 'Erection of single storey rear extension and alterations to front elevation including new windows and doors and enlarged front lightwell with stair'. NAMELY, to add new cast stone parapet screening, decorative architrave to windows, decorative metal screen to front windows, replacement of decorative balustrade with black painted metal balustrade, projecting portico and columns to entrance and coping stone to existing boundary wall.

As published by the council, reference 26/01444/FULL

Timeline

Dates from the published record

  1. 5 Mar 2026

    Received by Westminster

  2. 23 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/05892/TPO Granted

    12 Orme Square London W2 4RS

    T1 - London plane: crown reduce to previous, most recent reduction points (by approximately 5m).

    19 Aug 2025 1m away Trees
  • 25/09061/TPO Granted

    1 Orme Square London W2 4RS

    T1 1 x London plane: Reduce lateral branches on north side of canopy back to the previous, most recent reduction points, retaining shortened furnishing growth. Reduce the lower of the two scaffold branches on the south side of the canopy which are overhanging the roof of 1 Orme Square, back by approximately 1m below the previous, most recent reduction point , pruning back to the side branch growing downwards and to the west. Reduce the vertical section of the upper of the two scaffold branches on the south side of the canopy which are overhanging the roof of 1 Orme Square, back by approximately 2-3m below the previous, most recent reduction point, pruning back to the side branch growing downwards and to the south-west. Reduce overextended small diameter branches in the upper crown, which are over-hanging the roof of 1 Orme Square by approximately 2m to bring into the main canopy line, without undertaking an overall height reduction of the tree. (Branches overhanging the roof only, to be pruned.) Reduce low lateral branch on the east side, overhanging the conservatory at 2 Orme Square back to the property boundary (approx 3-4m), pruning back to suitable growth points to shape. Prune small diameter branches only back from properties to ensure a minimum clearance of 2m.

    15 Dec 2025 20m away Trees
  • 25/08085/TCA Awaiting decision

    10 Orme Square London W2 4RS

    Pyracantha (T1) - Remove

    6 Nov 2025 24m away Trees
  • 26/00591/TCA Granted

    1 Orme Square London W2 4RS

    T1 1 x cherry: crown reduce by 25% (1.3m) to suitable growth points with emphasis on inbound branches to reduce overhanging on shrub beds. T2 1 x crab apple: crown reduce by 25% (1.5m) to suitable growth points with emphasis on inbound branches to reduce overhanging on shrub beds whilst retaining rear sections for screening.

    2 Feb 2026 24m away Trees
  • 25/08228/ADFULL Awaiting decision

    10 Orme Square London W2 4RS

    Details of an arboricultural method statement and tree protection plan pursuant to condition 4 of planning permission dated 10th June 2025 (RN:25/02445/FULL)

    11 Nov 2025 24m away Full applications
  • 25/07882/ADFULL Awaiting decision

    10 Orme Square London W2 4RS

    Detailed drawings of decking in relation to the trunk of the London Plane Tree (T1) and detailed drawings of a hard and soft landscaping plan pursuant to condition 5 and 6 of planning permission dated 10th June 2025 (RN:25/02445/FULL).

    30 Oct 2025 24m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications