Planning application
8 Montagu Square London W1H 2LB
Works: Loft or dormer Roofing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Refurbishment works to the main roof including new roof slates, tapered lead valley gutters and new lead roof covering to existing dormer and refurbishment of lead box gutter on the rear elevation.
As published by the council, reference 26/01123/LBC
Application record
- Reference
- 26/01123/LBC
- Type
- Listed Building Consent Application
- Status
- Pending
- Received
- 23 Feb 2026
- Validated
- 25 Mar 2026
- Ward
- Marylebone
- Postcode
- W1H 2LB
Timeline
Dates from the published record
-
23 Feb 2026
Received by Westminster
-
25 Mar 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
MDB Associates Agent, registered in York
Active · incorporated 2002 · York
23 applications on PlanIndex · across 5 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
22 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Flat 2 5 Montagu Square London W1H 2LA
90% historically approved · decision due ~28 Aug
Installation of secondary glazing to existing historic single glazed timber windows. Replacement of existing window with new timber double glazed unit.
Decided Heritage and listed buildings Windows or glazing -
Flat 2 5 Montagu Square London W1H 2LA
88% historically approved · decision due ~28 Aug
Installation of secondary glazing to existing historic single glazed timber windows. Replacement of existing window with new timber double glazed unit.
Decided Full applications Windows or glazing -
Flat 4 39 Gloucester Place London W1U 8JB
Replacement of existing roof access hatch with access rooflight and associated remedial works.
Decided Full applications Loft or dormer -
27 Gloucester Place London W1U 8HU
Internal alterations including opening through party wall at ground floor level. (Site includes 29 Gloucester Place)
Granted Heritage and listed buildings 13 docs -
1 Gloucester Place Mews London W1U 8BA
Removal of the existing asphalt flat roof at first floor level and installation of a ventilated lead roof with other associated works.
Granted Full applications 12 docs -
29 Gloucester Place London W1U 8HT
90% historically approved · decision due ~28 Dec
Installation of glazed partitions and door sets to form meeting rooms on 2nd , 3rd and 4th floor offices.
Awaiting decision Heritage and listed buildings Windows or glazing
Other heritage and listed building applications
In Westminster
-
26/06288/LBC Decided
Barness Court 6 - 8 Westbourne Terrace London W2 3UW
Installation of a gas pipework to south elevation and wall. (Linked with 26/06287/FULL)
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)