Planning application
26/01084/NMA
12 Finchley Road London NW8 6EB
Proposal
Amendments to planning permission dated 1 April 2021 (RN: 21/01564/NMA) for which itself Varied application (RN: 19/03844/FULL) for which itself varied of condition 1 of planning permission dated 21 December 2017 (RN: 17/00938/FULL) which itself varied Condition 2 of planning permission dated 2 November 2003 (RN: 02/06302/FULL) for the: Demolition of existing buildings and erection of residential building of 6-8 storeys comprising 66 apartments including 17 affordable units and provision of 64 parking spaces in two basements. NAMELY, to allow the removal of 17 affordable housing units from the Description of Development, changes to internal layout and approved drawings and documents as listed in Condition 25.
As published by the council, reference 26/01084/NMA
Timeline
Dates from the published record
-
8 Dec 2025
Received by Westminster
-
5 Jun 2026
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
26/02538/MOD106 Awaiting decision
12 Finchley Road London NW8 6EB
Modification to the S106 agreement associated with planning permission dated 20th May 2019 under reference RN: 19/03844/FULL (which in itself was a variation to the S106 agreement & planning permission dated 19 November 2018 (RN: 17/00938/FULL); a variation to the S106 agreement & planning permission dated 2 November 2003 (RN: 02/06302/FUL) to amend 19/03844/FULL considered to improve the design, safety and functionality of the building and allow compliance with the Building Safety Act 2022 and the Higher-Risk Buildings Regulations 2023. The internal redesign of the development for compliance with the Act has inevitably resulted in and loss in floor area and a change to the residential unit mix, albeit the redesign has not resulted in any reduction in the number of permitted residential units.
-
25/07514/FULL Awaiting decision
62 Queen's Grove London NW8 6ER
Variation of condition 1 of planning permission dated 19th September 2023 (RN: 23/03269/FULL) for the Installation of replacement shopfront; works to the lower ground floor (basement) to increase headroom and to extend under the front yard with new external staircase and light well. Namely, to enclose the rear light well, add two glazed roof lights and take down the ground floor and basement rear walls.
-
26/00979/FULL Awaiting decision
62 Queen's Grove London NW8 6ER
Installation of replacement shopfront, alterations to lower floor to lower floor level and to increase headroom, extension under the front courtyard with new external staircase in the front lightwell. Enclosure of the rear lightwell and installation of rooflights.
-
26/01184/ADFULL Awaiting decision
63 Queen's Grove London NW8 6ER
Details of method statements regarding use of tall plant, scaffolding and lifting equipment, if any pursuant to condition 11 of planning permission dated 22 November 2023 (RN: 22/08530/FULL)
-
26/00762/TCA Granted
Walpole Mews London
T1 1 x ash (larger ash tree furthest to east): crown lift smaller branches to 3m retaining structural branches. Crown reduce height and spread by up to 2m, pruning back to suitable growth points. Prune back from property as required to provide 1m clearance. T2 1 x false acacia (adjacent to T1): fell T3 1 x ash (smaller ash tree, furthest to west): crown lift to 3m. reduce all round by 1-1.5m , to match height and spread of T1, pruning back to suitable growth points. Prune back from property as required to provide 1m clearance.
-
26/01141/TCA Withdrawn
70 Marlborough Hill London NW8 0NH
1 Lime species Prune to Clear structure/wires/buildings / fire escape by 2m 2 Lime species Re-Pollard. Part of regular maintenance for this tree. 2601
Other amendments applications
In Westminster
-
26/04962/NMA Awaiting decision
Serpentine Gallery Kensington Gardens Exhibition Road London W2 3XA
Amendments to planning permission dated 27 February 2025 (RN: 24/08940/FULL) for the installation of temporary art sculpture from 24 March 2025 to 09 September 2025; NAMELY to extend the temporary planning consent until 21st March 2027.
-
26/04951/NMA Awaiting decision
43 - 45 Portman Square London W1H 6LY
Amendments to planning permission dated 22 April 2026 (25/06153/FULL) for: Variation of Condition 1 of planning permission dated 7 April 2025 (24/04987/FULL) for: Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works NAMELY; to amend the wording of Condition 27 to allow basement demolition work to proceed.
-
26/04873/NMA Awaiting decision
Orbis House 5 Mansfield Street London W1G 9NG
Amendments to planning permission dated 05 September 2024 (RN: 24/01895/FULL) for: new courtyard surface including walk-on rooflight; window and door alterations; new window to Mansfield Mews at second floor level; new rooflights; repairs to roof and external brickwork; erection of new staircase in front area lightwell; partial infill of rear lightwell at ground floor level; erection of roof terrace; installation of PV panels at roof level; and associated works namely; to allow provision of guarding system to provide safe access for maintenance across the roof; alteration at south elevation omitting window SFW11 from the new WC, remove the existing RWP from the internal courtyard corner, removal of the existing plastic section of a redundant vent pipe at lower level and retain original lead; new cast iron rain water pipes at west elevation; and internal layout alterations at basement, ground, 2nd, 3rd floors. (Linked with 26/04876/LBC)
-
26/04870/NMA Awaiting decision
34 Park Street London W1K 2JD
Amendments to planning permission dated 8 May 2026 (25/07808/FULL) for general refurbishment and M&E upgrade of the office building namely; roof walkable skylight, GF meeting room wall mounted TV, garden bench and planters, fire lobbies, L4 glass partition, reception to hall door swing change, front lightwell electric cupboard change, wall panelling on LGF and L5, LGF modular screen, LGF courtyard window door infill, and LGF cove lighting.
-
26/04816/NMA Awaiting decision
Ebury Bridge Estate Ebury Bridge Road London SW1W 8PX
Amendments to planning permission dated 21 July 2023 (RN:23/00331/COOUT) for a mixed use development in outline for residential floorspace and ancillary residential facilities (Class C3) non-residential floorspace comprising flexible retail (Classes A1 - A4), community (Class D1), leisure (Class D2) and workspace (Class B1) floorspace; provision of basement; new pedestrian and vehicular access; and associated amenity space, open space, plant, landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works; and detailed planning consent for Blocks 7 and 8 comprising residential floorspace and ancillary residential facilities (Class C3); provision of a basement; new pedestrian and vehicular access; and associated amenity space landscaping, car and cycle parking, refuse storage, servicing area, and other associated infrastructure works, namely amendments to the approved Masterplan Phasing to incorporate enabling works and piling in Phase 2a and 3a.