Planning application
26/01071/FULL
4 Clifton Hill London NW8 0QG
Proposal
Erection of ground floor side infill extension and addition of rear oriel window; minor alterations to front boundary wall, railings and gate pillars; replacement of rear terrace and enhanced boundary screening.
As published by the council, reference 26/01071/FULL
Timeline
Dates from the published record
-
19 Feb 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04098/ADFULL Awaiting decision
4 Clifton Hill London NW8 0QG
Details of method statement and tree protection plan, drawings of a hard and soft landscaping scheme: pursuant to condition 5 and 6 of planning permission dated 27th May 2026 (RN 26/01071/FULL)
-
25/05102/FULL Granted
6 Clifton Hill London NW8 0QG
Installation of one air conditioning unit located to rear within acoustic enclosure.
-
25/05807/FULL Awaiting decision
2 Clifton Hill London NW8 0QG
Erection of a replacement three storey dwellinghouse (plus basement); installation of ASHP in the front garden; hard and soft landscaping; and all associated works and infrastructure following the demolition of the existing dwelling.
-
25/06208/TCA Granted
8 Clifton Hill London NW8 0QG
1 x Mimosa (T1): fell
-
26/04312/FULL Awaiting decision
1 Clifton Hill London NW8 0QE
Installation of new window and door surrounds and installation of new coping to the rear elevation, in replacement of the existing lead flashing.
-
26/04000/FULL Awaiting decision
1 Clifton Hill London NW8 0QE
Modification to existing vehicle gate and front brick walls to incorporate a new pedestrian gate, with the aim of improving access and safety for pedestrians entering the property. Brickwork, coping and metal gates to match existing.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.