Planning application
427 - 429 Harrow Road London W10 4SA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of facing material pursuant to condition 3 of planning permission dated 03 March 2025 (RN 24/07257/FULL).
As published by the council, reference 26/01053/FULL
Application record
- Reference
- 26/01053/FULL
- Type
- Approval of Details (Full PP)
- Status
- Pending
- Received
- 18 Feb 2026
- Validated
- 18 Feb 2026
- Ward
- Harrow Road
- Postcode
- W10 4SA
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2026.
-
26/01053/ADFULL Awaiting decision
427 - 429 Harrow Road London W10 4SA
Details of facing material pursuant to condition 3 of planning permission dated 03 March 2025 (RN 24/07257/FULL).
Timeline
Dates from the published record
-
18 Feb 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
The Design & Surveying Consultancy Ltd Agent, a surveying firm registered in Dover
Active · incorporated 2024 · Dover
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
427 - 429 Harrow Road London W10 4SA
88% historically approved · decision due ~15 Apr
Details of facing material pursuant to condition 3 of planning permission dated 03 March 2025 (RN 24/07257/FULL).
Awaiting decision Full applications 10 docs -
594 Harrow Road London W10 4NJ
88% historically approved · decision due ~1 Jul
Construction of two rear dormer roof extensions and installation of two front-facing rooflights.
Awaiting decision Full applications Extension Loft or dormer 13 docs -
598 Harrow Road London W10 4NJ
88% historically approved · decision due ~10 Jul
Erection of a dormer extension to the rear roofslope and installation of rooflight to the front roofslope.
Awaiting decision Full applications Extension Loft or dormer 19 docs -
598 Harrow Road London W10 4NJ
Erection of a dormer extension to the rear roofslope and installation of two rooflights to the front roofslope.
Refused Full applications Extension Loft or dormer 17 docs -
33 Alperton Street London W10 4NG
84% historically approved · decision due ~10 Nov
Installation of solar panels.
Awaiting decision Lawful development -
Ground Floor 425 Harrow Road London W10 4RE
Details of a servicing management plan and details of how waste is to be stored on site and how materials for recycling will be stored separately pursuant to condition 5 and 9 of planning permission dated 28th August 2025 (RN:25/04438/FULL)
Granted Full applications 17 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)