Planning application
26/00994/FULL
27 Gloucester Mews London W2 3HE
Proposal
Alterations to basement flat and alterations to the lower ground floor elevation window and door at 72 Gloucester Terrace. [Linked to 26/00995/LBC]
As published by the council, reference 26/00994/FULL
Timeline
Dates from the published record
-
17 Feb 2026
Received by Westminster
-
30 Mar 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00995/LBC Awaiting decision
27 Gloucester Mews London W2 3HE
Alterations to basement flat and alterations to the lower ground floor elevation window and door at 72 Gloucester Terrace. [Linked to 26/00994/FULL]
-
25/08057/LBC Awaiting decision
Basement Flat 68 Gloucester Terrace London W2 3HH
Installation of an internal ensuite shower room and utility cupboard within the existing under-pavement vault. (Retrospective)
-
26/02136/LBC Awaiting decision
80 Gloucester Terrace London W2 3HH
Construction of box to conceal pipework on front elevation at basement floor level. (Retrospective) (Linked to 26/02135/FULL)
-
26/02135/FULL Awaiting decision
80 Gloucester Terrace London W2 3HH
Construction of box to conceal pipework on front elevation at basement floor level. (Retrospective) (Linked to 26/02136/LBC)
-
25/06496/ADLBC Granted
Second Floor 58 Westbourne Terrace London W2 3UJ
Details of section and a plan drawing (and accompanying written description as appropriate) showing the new partition between the 'living/dining' and both the 'bedroom 2' and 'hallway' and showing that new partition being formed with new timber studs and constructed in a traditional manner including with the new timber studs designed to fully integrate with the original mortice holes remaining present in the floor joist below this (former) partition line and new fireplace pursuant to Conditions 3 and 6 of Listed Building Consent dated 01 September 2025 (RN25/04125/LBC)
-
25/06433/LBC Awaiting decision
52 Westbourne Terrace London W2 3UJ
Internal cladding over existing latticework surrounding the lift shaft
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.