Skip to content
PlanIndex Get alerts
Menu

Planning application

2 Wimpole Mews London W1G 8PE

Awaiting decision Westminster 26/00611/ADFULL Approval of Details (Full PP)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Detailed drawings (1:20 and1:5) inc existing fabric junction pursuant to Condition 4 of planning permission dated 31 July 2025 (RN: 25/03972/FULL)

As published by the council, reference 26/00611/ADFULL

Application record

Reference
26/00611/ADFULL
Type
Approval of Details (Full PP)
Status
Pending
Received
3 Feb 2026
Validated
3 Feb 2026
Ward
Marylebone
Postcode
W1G 8PE

Timeline

Dates from the published record

  1. 3 Feb 2026

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 31 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 66 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Patalab Architects Agent, an architecture practice registered in London

Active · incorporated 2022 · London

25 applications on PlanIndex · across 4 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 91 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 79 Harley Street London W1G 9HW

    25/09214/FULL Submitted 19 Dec 2025 50 yards away

    Variation of conditions 1 and 5 of planning permission dated 31 August 2023 (RN: 23/04631/FULL) for the: External and internal alterations at lower ground, ground and first floor rear flat roof level associated with the installation of a new MR Linac machine at lower ground floor level. Installation of new plant and relocation of existing plant, including a quench pipe within the external area at rear ground floor level and on the first floor flat roof area, the removal of skylight and associated works. NAMELY, to allow internal and external amendments and the installation of additional plant.

    Granted Full applications 26 docs
  • 79 Harley Street London W1G 9HW

    25/09253/LBC Submitted 22 Dec 2025 50 yards away

    Internal alterations at basement and ground floor levels and external alterations including the removal of roof lanterns; installation of new plant within the lightwell at ground floor level and on the flat roof area at first floor level.

    Granted Heritage and listed buildings 21 docs
  • 9 Wimpole Mews London W1G 8PB

    09/10469/CAC Submitted 23 Dec 2009 50 yards away

    Demolition of part of existing roof.

    Withdrawn Heritage and listed buildings Demolition 2 docs
  • 7 Wimpole Mews London W1G 8PB

    06/07106/ADLBC Submitted 30 Aug 2006 50 yards away

    Detailed drawings/specifications showing the following alteration to the scheme: full details of how the interior of the retained vault shall be restored to a brick finish, the new lift shaft to be clad in rolled leadwork, the doors to the vaults to be a vertically boarded type, pursuant to Condition 2 parts 1, 3 and 5 of listed building consent dated 26 June 2006 (RN 06/02820) (Part Approved).

    Granted Conditions 1 doc
  • 7 Wimpole Mews London W1G 8PB

    06/06994/ADFULL Submitted 30 Aug 2006 50 yards away

    Details of the new lift shaft to be clad in rolled leadwork pursuant to part 3 of Condition 5 of planning permission dated 26 June 2006 (RN: 06/02819).

    Granted Full applications 5 docs
  • 7 Wimpole Mews London W1G 8PB

    06/02820/LBC Submitted 11 Apr 2006 50 yards away

    Internal layout reconfigured, lift shaft and new staircase added. Internal levels changed, new doors and window to west elevation and new skylights and ventilations to roof.

    Granted Heritage and listed buildings Windows or glazing 2 docs

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06317/FULL Awaiting decision

    124 Hamilton Terrace London NW8 9UT

    Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications