Planning application
26/00370/FULL
47 - 49 Belgrave Road London SW1V 2BB
Proposal
Installation of a sesame lift to hotel entrance; erection of extensions at rear basement, second and third floor levels to rear of No.49; erection of rear extension at third floor level to rear of No 47.; and installation of an internal lift.
As published by the council, reference 26/00370/FULL
Timeline
Dates from the published record
-
22 Jan 2026
Received by Westminster
-
4 Mar 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/02565/FULL Awaiting decision
25 Charlwood Street London SW1V 2DZ
Installation of replacement windows.
-
25/07228/FULL Awaiting decision
37 - 41 Belgrave Road London SW1V 2BB
Installation of three new air conditioning units within an acoustic compound in the rear basement lightwell of No. 41 and a wall mounted air conditioning unit together with replacement of existing door with a louvred door to the basement vault of 2A Charlwood Place.
-
08/05809/FULL Refused
68 - 76 Belgrave Road London SW1V 2BP
Installation of extract duct from basement to roof level to rear.
-
26/02129/FULL Awaiting decision
Flat 5 50 - 52 Denbigh Street London SW1V 2EU
Erection of extensions at rear to enclose two rear terraces.
-
26/04122/LBC Awaiting decision
Flat 8 56 Belgrave Road London SW1V 2DA
Replacement and repair of seven timber sash windows with like-for-like at fourth floor level. Linked with 26/04121/FULL
-
26/04121/FULL Awaiting decision
Flat 8 56 Belgrave Road London SW1V 2DA
Replacement and repair of seven timber sash windows with like-for-like at fourth floor level. Linked with 26/04122/LBC
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.