Planning application
26/00362/ADFULL
New Zealand House 80 Haymarket London SW1Y 4TE
Proposal
Details of stone replacement pursuant to condition 6 (i) of listed building consent dated 12 February 2021 (RN: 19/07816/LBC).
As published by the council, reference 26/00362/ADFULL
Timeline
Dates from the published record
-
22 Jan 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01912/ADLBC Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed written and photograph Materials Schedules of the new or replacement external facing materials you propose to use, including glazing for: (a) New Zealand House; and (b) The Royal Opera Arcade - partial discharge for the Pall Mall entrance canopy pursuant to Condition 5 of listed building consent dated 30 January 2024 (RN: 23/00371/LBC).
-
26/02459/ADFULL Awaiting decision
New Zealand House 80 Haymarket London SW1Y 4TE
Details of new external signage strategy pursuant to condition 32 (g) of planning permission dated 8th April 2024 (RN: 23/00571/FULL). Linked to 26/02536/ADLBC
-
26/02536/ADLBC Awaiting decision
New Zealand House 80 Haymarket London SW1Y 4TE
Details of new external signage strategy pursuant to condition 6 (j) of listed building consent dated 8th April 2024 (RN: 23/00571/FULL). Linked to 26/02459/ADFULL
-
26/02961/ADLBC Awaiting decision
New Zealand House 80 Haymarket London SW1Y 4TE
Details of New, replacement or re-built staircases and balustrades (detailed plans, elevations and sections at 1:20, including defining any salvaged materials pursuant to condition 6(G) of listed building consent dated 12th February 2021 (RN: 19/07816/LBC).
-
25/00117/ADLBC Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed written and photograph Materials Schedules of the new or replacement external facing materials you propose to use, including glazing for: New Zealand House; and The Royal Opera Arcade pursuant to condition 5 of listed building consent dated 08 April 2024 (RN: 23/00371/LBC).
-
26/02618/ADFULL Awaiting decision
New Zealand House 80 Haymarket London SW1Y 4TE
Details of new visible security fixtures in the Royal Opera Arcade pursuant to condition 33(f) of planning permission dated 8th April 2024 (RN: 23/00571/FULL). Linked to 26/02704/ADLBC
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.