Planning application
26/00196/FULL
Dolphin Square London
Proposal
Use of the first floor of the amenity block as a café / bar (Sui Generis) (Retrospective).
As published by the council, reference 26/00196/FULL
Timeline
Dates from the published record
-
14 Jan 2026
Received by Westminster
-
9 Apr 2026
Validated
Checked as complete and ready for consideration.
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04183/NMA Awaiting decision
Dolphin Square London
Amendments to planning permission dated 22nd May 2026 (RN:26/00196/FULL) for Use of part first floor of amenity block as a café / bar (Sui Generis) (Retrospective). Namely, to regularise opening hours.
-
26/04094/ADFULL Awaiting decision
Dolphin Square London
Details of supplementary acoustic report pursuant to condition 7 of planning permission dated 08 March 2023 (RN: 23/00458/FULL)
-
25/08433/TCA Awaiting decision
Trees On Dolphin Square London SW1V 3LX
Tree pruning to allow erection of scaffolding for building works to front of building. Scope of works reviewed on site with WCC Tree Officer as follows: 1 x willow: prune back from property to give clearance of approximately 0.8m, pruning back to the mid-point line of the two structural branches as annotated below i.e. removing the right hand branch and retaining the left hand branch. Reduce remaining crown by up to 1m to shape and tidy. Photo attached. 1 x hawthorn: prune back from property to give clearance of approximately 1.0m
-
26/04102/ADFULL Awaiting decision
Dolphin Square London
Details of sound insulation measures pursuant to condition 9 of planning permission dated 08 March 2023 (RN: 23/00458/FULL)
-
26/04103/ADFULL Awaiting decision
Dolphin Square London
Details of louvred and brick enclosures to the ASHPs at roof level pursuant to condition 10 of planning permission dated 08 March 2023 (RN: 23/00458/FULL)
-
26/03322/FULL Awaiting decision
Duncan House Dolphin Square London SW1V 3PW
Change of use from ancillary residential (storage) to residential at ground and lower ground floors of Beatty House to create one self-contained duplex dwelling, including removal of existing lightwell cap, introduction of mezzanine floor, re-introduction of infilled windows, provision of external access, works to parapet wall and associated internal alterations
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.