Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00112/FULL

106 Hamilton Terrace London NW8 9UP

Granted Westminster Full Planning Permission Application

Proposal

Variation of conditions 1 and 13 of planning permission dated 16 June 2023 ( RN 23/02171/FULL), which in itself was a variation of Condition 18 (Construction Management Plan (CMP) of the planning permission dated 26th November 2021 (RN 21/05740/FULL); and a variation of Condition 1 of planning permission dated 16 March 2016 (RN: 16/00374/FULL) and further to the varied condition 1 of planning permission dated 28 July 2015 (RN: 15/02336/FULL) for excavation of a basement beneath existing building, part of front and rear gardens, demolition of rear facade, extensions to the rear and at roof level in connection with the use of the building as a single house. NAMELY, to reposition the ASHP condenser and acoustic enclosure and also accompanied by a revised Garden Masterplan.

As published by the council, reference 26/00112/FULL

Timeline

Dates from the published record

  1. 9 Jan 2026

    Received by Westminster

  2. 9 Apr 2026

    Decision issued: Application Permitted

  3. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/05532/ADFULL Refused

    106 Hamilton Terrace London NW8 9UP

    Detailed drawings of a hard and soft landscaping scheme pursuant to Condition 13 of planning permission dated 26 November 2021 (RN21/05740/FULL)

    7 Aug 2025 32m away Full applications
  • 25/08662/FULL Granted

    12 Alma Square NW8 9QA

    Amalgamation of two self-contained flats into a single family dwelling; replacement of windows with double-glazed painted timber units and installation of five conservation-style rooflights.

    26 Nov 2025 58m away Full applications
  • 25/06416/FULL Awaiting decision

    4A Abercorn Place NW8 9XR

    Exterior alterations to existing building, including introduction of new pergola to rear elevation, extension of existing ground floor plant/storage room, modifications to existing windows and doors, new traditional roof lantern rooflight, and changes to existing boundary wall.

    8 Sep 2025 67m away Full applications
  • 26/03542/FULL Awaiting decision

    4A Abercorn Place NW8 9XR

    Installation of air conditioning unit within front lightwell. Installation of air conditioning unit within an acoustic enclosure within rear garden.

    29 May 2026 67m away Full applications
  • 26/02764/NMA Awaiting decision

    4A Abercorn Place NW8 9XR

    Amendments to planning permission dated 13th February 2026 (RN:25/06416/FULL) for Exterior alterations to existing building, including introduction of new pergola to rear elevation, extension of existing ground floor plant/storage room, modifications to existing windows and doors, new traditional roof lantern rooflight, and changes to existing boundary wall. Namely, a section of the existing masonry boundary wall is to be increased in height to improve privacy and security, and to screen the bin storage area and replace the existing triple sash window with a new timber-framed door and adjacent side window, designed to match the existing widnow.

    24 Apr 2026 68m away Amendments
  • 26/03382/FULL Awaiting decision

    18 Alma Square London NW8 9QA

    Single storey rear extension to the lower ground floor, with external alterations comprising new and replacement windows, roof lights, installation of solar panels, widening of the lower ground floor steps and installation of front door to lower ground floor.

    21 May 2026 70m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications