Planning application
Hyde Park Serpentine Road London W2 2UH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Use of the Parade Ground area of Hyde Park for the British Summer Time Concert event, including associated structures, for a temporary two year period between: 25 June 2026 and 12 July 2026 with site set up and clearance between 3 June 2026 and 23 July 2026; and 24 June 2027 and 11 July 2027 with site set up and clearance between 2 June 2027 and 22 July 2027.
As published by the council, reference 25/09350/FULL
Application record
- Reference
- 25/09350/FULL
- Type
- Full Planning Permission Application
- Status
- Pending
- Received
- 24 Dec 2025
- Validated
- 24 Dec 2025
- Ward
- Hyde Park
- Postcode
- W2 2UH
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2025.
-
26/06612/ADFULL Awaiting decision
Hyde Park Serpentine Road London W2 2UH
Details of an Arboricultural Assessment to be submitted within three months of the completion of the 2026 event setting out whether any remediation measures have been undertaken or are required to protect the trees following the event pursuant to Condition 8 of planning permission dated 4 June 2026 (25/09350/FULL).
-
26/03400/LBC Awaiting decision
Hyde Park Serpentine Road London W2 2UH
Repairs to damage, cracks, and failing past repairs to the Little Nell statue.
Timeline
Dates from the published record
-
24 Dec 2025
Received by Westminster
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/06612/ADFULL Awaiting decision
Hyde Park Serpentine Road London W2 2UH
Details of an Arboricultural Assessment to be submitted within three months of the completion of the 2026 event setting out whether any remediation measures have been undertaken or are required to protect the trees following the event pursuant to Condition 8 of planning permission dated 4 June 2026 (25/09350/FULL).
Documents
Plans, drawings, consultee responses and the officer's report
73 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
99 Park Lane London W1K 7TH
100% historically approved · decision due ~31 Aug
T2 - Tilia vulgaris: Remove epicormic growth from base to 3m from ground level.
Awaiting decision Trees 7 docs -
94 Park Lane London W1K 7TD
90% historically approved · decision due ~30 Jul
Structural facade repairs to the front elevation, specifically to the 4th floor bow balcony, and like-for-like replacement of the zinc canopy above.
Awaiting decision Heritage and listed buildings 8 docs -
95 Park Lane London W1K 7TE
Details of the installation of screening surrounding each grouping of plant to be coloured dark grey and construction details to include materiality and opening mechanisms of the access hatch pursuant to Conditions 3 and 5 of listed building consent dated 17 July 2025 (RN25/03227/LBC) (Linked 26/01956/ADFULL)
Decided Conditions 6 docs -
95 Park Lane London W1K 7TE
88% historically approved · decision due ~20 May
Details of the installation of screening surrounding each grouping of plant to be coloured dark grey and construction details to include materiality and opening mechanisms of the access hatch pursuant to Conditions 6 and 8 of planning permission dated 17 July 2025 (RN25/02688/FULL) (Linked 26/01957/ADLBC)
Awaiting decision Full applications 5 docs -
95 Park Lane London W1K 7TE
Details of damp-proofing system pursuant to condition 3 of listed building consent dated 22 August 2023 (RN: 23/03566/LBC)
Granted Conditions 8 docs -
94 Park Lane London W1K 7TD
89% historically approved · decision due ~20 May
Details of the installation of screening surrounding the plant to be coloured dark grey pursuant to Condition 4 of listed building consent dated 15 August 2025 (RN25/03030/LBC) (Linked 26/01952/ADFULL)
Awaiting decision Conditions 2 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)