Skip to content
PlanIndex Get alerts
Menu

Planning application

17 - 18 Irving Street London WC2H 7AU

Granted Westminster 25/09338/FULL Full Planning Permission Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to the shopfront.

As published by the council, reference 25/09338/FULL

Application record

Reference
25/09338/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
24 Dec 2025
Validated
24 Dec 2025
Decided
19 Mar 2026
Ward
St James's
Decision by
Delegated Decision
Postcode
WC2H 7AU

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/09339/ADV Granted

    17 - 18 Irving Street London WC2H 7AU

    Display of internally illuminated projecting sign measuring 0.8m x 0.8m and display of two internally illuminated fascia sign measuring 0.5m x 1.1m

    Decided 19 Mar 2026 Advertising

Timeline

Dates from the published record

  1. 24 Dec 2025

    Received by Westminster

  2. 19 Mar 2026

    Decision issued: Application Permitted

  3. 20 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Firstplan Ltd Agent, registered in London

Active · incorporated 2003 · London

751 applications on PlanIndex · across 109 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 19 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 17 - 18 Irving Street London WC2H 7AU

    25/09339/ADV Submitted 24 Dec 2025 50 yards away

    Display of internally illuminated projecting sign measuring 0.8m x 0.8m and display of two internally illuminated fascia sign measuring 0.5m x 1.1m

    Granted Advertising 10 docs
  • 19-20 Irving Street London WC2H 7AU

    23/03892/FULL Submitted 11 Jun 2023 50 yards away

    Possible duplicate to 23/03894/FULL

    Withdrawn Full applications
  • 19 - 20 Irving Street London WC2H 7AU

    26/01365/ADV Submitted 3 Mar 2026 50 yards away

    84% historically approved · decision due ~3 May

    Display of one externally illuminated fascia sign measuring 5.5m x 0.73m and one internally illuminated (letters only) projecting sign measuring 0.8m x 0.8m, and one externally illuminated projecting sign measuring 0.8m x 0.8m.

    Awaiting decision Advertising 6 docs
  • 19 - 20 Irving Street London WC2H 7AU

    26/05329/ADV Submitted 6 Aug 2026 50 yards away

    84% historically approved · decision due ~12 Oct

    Display of non-illuminated projected sign measuring 0.70m x 0.70m, and halo illuminated door sign measuring 0.20m x 1.80m.

    Decided Advertising
  • Basement And Ground Floor 16 Irving Street London WC2H 7AU

    25/07762/ADV Submitted 8 Sep 2025 50 yards away

    Display of internally illuminated projecting sign measuring 0.737m X 0.737m.

    Refused Advertising 15 docs
  • Basement And Ground Floor 16 Irving Street London WC2H 7AU

    25/06351/ADV Submitted 8 Sep 2025 50 yards away

    Display of internally illuminated fascia sign (letters only) measuring 5.74mx 0.737m.

    Granted Advertising 23 docs

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of new natural Portland Stone step surfaces to the two highway facing front entrance doors. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06277/FULL Awaiting decision

    Hospital 60 Grove End Road London NW8 9NH

    Variation of conditions 1 and removal of condition 6 of planning permission dated 12th November 2019 (RN 19/07202/FULL) for the Variation of condition 12 of planning permission dated 21 June 2013 (RN: 13/01330/FULL) for the: Demolition of single storey block to north east elevation of main hospital building. Erection of three storey building (plus basement level) with link to existing hospital fronting onto Grove End Road and erection of two storey extension to the main entrance building, both to provide additional hospital accommodation (Class D1). Installation of mechanical plant and associated external alterations. NAMELY, to include amended phase 2 drawings and condition 6 to be removed as the as approved 11 car parking space are no longer proposed and the car lift is no longer shown on the amended plans.

    Received 14 Sep, published by the council 22 Sep 2026 Full applications