Planning application
South West Wing Bush House Strand London WC2B 4RD
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of new windows pursuant to condition 30 (part A) of planning permission dated 10 March 2025 (RN: 24/06619/FULL)
As published by the council, reference 25/09062/ADFULL
Application record
- Reference
- 25/09062/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 15 Dec 2025
- Validated
- 15 Dec 2025
- Decided
- 27 Feb 2026
- Ward
- St James's
- Decision by
- Delegated Decision
- Postcode
- WC2B 4RD
Site history
Applications at this address on the Westminster register
This site has had 16 applications since 2023: 4 approved, 0 refused.
-
26/06049/ADFULL Awaiting decision
South West Wing Bush House Strand London WC2B 4RD
Details of new frontages, bay study, glazed roof and framing and lighting units within the planting pursuant to Condition 30 (b),(c),(d) and (e) of planning permission dated 10 March 2025 (RN: 24/06619/FULL) as amended by RN: 26/04509/NMA.
-
26/05637/ADFULL Decided
South West Wing Bush House Strand London WC2B 4RD
Details of samples of facing materials pursuant to condition 29 of planning permission dated 10 March 2025 (RN: 24/06619/FULL).
-
26/05006/ADFULL Granted
South West Wing Bush House Strand London WC2B 4RD
Details of roof slate, pursuant to part discharge of Condition 29 of planning permission dated 10 March 2025 (RN: 24/06619/FULL).
-
26/04749/ADV Decided
South West Wing Bush House Strand London WC2B 4RD
Display of a non-illuminated scaffold wrap measuring 10.5m x 17.5m for a temporary period from 01 September 2026 to 01 December 2027.
-
26/04509/NMA Awaiting decision
South West Wing Bush House Strand London WC2B 4RD
Amendments to planning permission dated 10 March 2025 (RN: 24/06619/FULL) for Reconfiguration and extension of the existing building, including: creation of double height rear courtyard extension, partial lowering of existing basement floor level, new ground floor entrance doors and first floor windows to principal frontages, works to lightwells, re-provision of, and extension to, existing rooftop plantroom, provision of plant equipment and plant screen, installation of a green roof and photovoltaic panels at roof level, provision of end of trip facilities and cycle parking, replacement of all windows, creation of hard and soft landscaping to the building and immediate surrounds. Namely, to allow minor refinements to some aspects of the proposed development, including but not limited to the design of the Montreal Place gates and low-level balustrades on Montreal Place, the roof profile and plant layouts, and the Agora / atrium canopies and doors.
-
26/04407/ADFULL Decided
South West Wing Bush House Strand London WC2B 4RD
Details of servicing management plan pursuant to condition 10 of planning permission dated 07 March 2026 (RN: 24/06619/FULL).
-
26/04061/ADFULL Decided
South West Wing Bush House Strand London WC2B 4RD
Detailed drawings of a hard and soft landscaping scheme and details of the soil or other planting medium for each of the different areas of soft landscaping pursuant to Conditions 14 and 16 of planning permission dated 10 March 2025 (RN: 24/06619/FULL).
-
26/03490/ADFULL Awaiting decision
South West Wing Bush House Strand London WC2B 4RD
Details of noise assessment report in relation to Plant and Machinery and Sound Insulation pursuant to conditions 26 and 27 of planning permission dated 10 march (RN: 24/06619/FULL).
-
26/02613/ADV Awaiting decision
South West Wing Bush House Strand London WC2B 4RD
Display of non-illuminated hoarding measuring a total of 42.8m x 2.54m for a temporary period from 01 April 2026 to 30 September 2027.
-
26/00999/ADV Granted
South West Wing Bush House Strand London WC2B 4RD
Display of eleven non-illuminated photographs on hoarding; eight measuring 2.2m x 1.36m; two measuring 2.45m x 2.5m and one measuring 2.45m x 5.78m for a temporary period from 17 February 2026 to 30 June 2026.
Timeline
Dates from the published record
-
15 Dec 2025
Received by Westminster
-
27 Feb 2026
Decision issued: Application Permitted
-
20 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Montagu Evans LLP Agent, registered in London
Active · incorporated 2005 · London
1,094 applications on PlanIndex · across 122 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 27 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
South West Wing Bush House Strand London WC2B 4RD
87% historically approved · decision due ~23 Jul
Details of noise assessment report in relation to Plant and Machinery and Sound Insulation pursuant to conditions 26 and 27 of planning permission dated 10 march (RN: 24/06619/FULL).
Awaiting decision Full applications 5 docs -
South West Wing Bush House Strand London WC2B 4RD
87% historically approved · decision due ~1 Apr
Details of Vent details extract fumes before use pursuant to Condition 25 of planning permission dated 10 March 2025 (RN24/06619/FULL)
Awaiting decision Full applications 5 docs -
South West Wing Bush House Strand London WC2B 4RD
89% historically approved · decision due ~28 Aug
Details of servicing management plan pursuant to condition 10 of planning permission dated 07 March 2026 (RN: 24/06619/FULL).
Decided -
South West Wing Bush House Strand London WC2B 4RD
89% historically approved · decision due ~14 Aug
Detailed drawings of a hard and soft landscaping scheme and details of the soil or other planting medium for each of the different areas of soft landscaping pursuant to Conditions 14 and 16 of planning permission dated 10 March 2025 (RN: 24/06619/FULL).
Decided -
South West Wing Bush House Strand London WC2B 4RD
89% historically approved · decision due ~13 Oct
Details of samples of facing materials pursuant to condition 29 of planning permission dated 10 March 2025 (RN: 24/06619/FULL).
Decided -
South West Wing Bush House Strand London WC2B 4RD
84% historically approved · decision due ~11 Sep
Display of a non-illuminated scaffold wrap measuring 10.5m x 17.5m for a temporary period from 01 September 2026 to 01 December 2027.
Decided Advertising
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level comprising repolacement window and installation of double opening door.
-
26/06234/FULL Awaiting decision
40 Grosvenor Place London SW1X 7HJ
Use of lower ground floor of Unit 3 and ground floor of Unit 2 as gym (Class E(d)) and/ or office (Class E(g))
-
26/06249/FULL Awaiting decision
53 Wimpole Street London W1G 8YH
Removal and Installation of external rear air condensers and associated pipe work to ground floor, including internal works to ground and first floor. (Linked with 26/06250/LBC)
-
26/03576/FULL Decided
15A Devonshire Terrace London W2 3DW
Erection of an infill extension to basement courtyard to form new bedroom and internal alterations. (Linked with 26/03577/LBC)