Planning application
South West Wing Bush House Strand London WC2B 4RD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of roof slate, pursuant to part discharge of Condition 29 of planning permission dated 10 March 2025 (RN: 24/06619/FULL).
As published by the council, reference 26/05006/ADFULL
Application record
- Reference
- 26/05006/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Decided
- Decision
- Application Permitted
- Received
- 27 Jul 2026
- Validated
- 27 Jul 2026
- Decided
- 31 Jul 2026
- Ward
- St James's
- Decision by
- Delegated Decision
- Postcode
- WC2B 4RD
Timeline
Dates from the published record
-
27 Jul 2026
Received by Westminster
-
31 Jul 2026
Decision issued: Application Permitted
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
935 applications on PlanIndex · across 112 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
South West Wing Bush House Strand London WC2B 4RD
92% historically approved · decision due ~1 Sep
Amendments to planning permission dated 10 March 2025 (RN: 24/06619/FULL) for Reconfiguration and extension of the existing building, including: creation of double height rear courtyard extension, partial lowering of existing basement floor level, new ground floor entrance doors and first floor windows to principal frontages, works to lightwells, re-provision of, and extension to, existing rooftop plantroom, provision of plant equipment and plant screen, installation of a green roof and photovoltaic panels at roof level, provision of end of trip facilities and cycle parking, replacement of all windows, creation of hard and soft landscaping to the building and immediate surrounds. Namely, to allow minor refinements to some aspects of the proposed development, including but not limited to the design of the Montreal Place gates and low-level balustrades on Montreal Place, the roof profile and plant layouts, and the Agora / atrium canopies and doors.
Awaiting decision Amendments Extension Windows or glazing 6 docs -
South West Wing Bush House Strand London WC2B 4RD
Display of eleven non-illuminated photographs on hoarding; eight measuring 2.2m x 1.36m; two measuring 2.45m x 2.5m and one measuring 2.45m x 5.78m for a temporary period from 17 February 2026 to 30 June 2026.
Granted Advertising 17 docs -
South West Wing Bush House Strand London WC2B 4RD
85% historically approved · decision due ~1 Jul
Display of non-illuminated hoarding measuring a total of 42.8m x 2.54m for a temporary period from 01 April 2026 to 30 September 2027.
Awaiting decision Advertising 10 docs -
Bush House 30 Aldwych London WC2B 4BG
90% historically approved · decision due ~26 Aug
Cradle fixings, Repointing and Urgent Repairs required following the consented application regarding cleaning works to Bush House (24/01222/LBC)
Awaiting decision Heritage and listed buildings -
Bush House 30 Aldwych London WC2B 4BG
90% historically approved · decision due ~25 Jun
Details of bird deterrent details and cleaning methodology to include DOFF and Poultices Method Statements pursuant to conditions 3 and 4 of listed building consent dated 19th June 2024 (RN: 24/01222/LBC).
Awaiting decision Conditions 3 docs -
South West Wing Bush House Strand London WC2B 4RD
Details of code of construction practice pursuant to condition 20 of planning permission dated 10th March 2023 (RN:24/06619/FULL)
Granted Full applications 9 docs
Other full applications applications
In Westminster
-
26/06024/FULL Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)
-
26/06017/FULL Awaiting decision
38 Lauderdale Mansions Lauderdale Road London W9 1NE
Installation of an external AC Unit / Heat Pump at roof level.
-
26/05938/FULL Awaiting decision
24 Vincent Square London SW1P 2NJ
Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.
-
26/05935/FULL Awaiting decision
47 Hereford Road London W2 5AH
Installation of one number new external condenser unit to the southerly elevation service alley.
-
26/05959/FULL Awaiting decision
Basement And Ground Floor 50 New Bond Street London W1S 1BJ
Installation of three new condensers on the roof, within an existing designated plant area.